Attachment 7 - 00 01 10 - Table of Contents
Updated
A PDF document (148 KB) attached to FY27 Multiple Award Task Order Contract, SEED PROJECT NO: 550-25-108, Renovate Bathrooms in B103 PRRTP & B64/7 at the VA Illiana Health Care System (VIHCS), Danville IL., from the Department of Veterans Affairs. Due Nov 23, 2026, 10:00 AM (UTC-6).
File name: Attachment 7 - 00 01 10 - Table of Contents.pdf
The full file is for paid members, or buy this bid alone.
Preview
VA Danville Renovate B103 PRRTP Bathrooms
VA Illiana Health Care System
1900 E. Main St., Danville, IL 61832
Project # 550-25-108
06-01-24
DEPARTMENT OF VETERANS AFFAIRS
VHA MASTER SPECIFICATIONS
Section 00 01 10
SECTION NO
DIVISION AND SECTION TITLES
DATE
DIVISION 00 - SPECIAL SECTIONS
00 01 15
List of Drawing Sheets
05-20
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00
01 01 10
01 01 10
01 01 10
01 12 16
01 12 17
01 32 16.15
01 33 23
01 33 24
01 35 26
01 58 16
01 74 19
General Requirements
Fire and Safety Control(FSS)
1 Hour Construction Smoke Barrier
IC Infection Control
Work Schedule
Job Meetings
Project Schedules (Small Projects – Design/Bid/Build
Shop Drawings, Product Data, and Samples
Electronic Submittals
Safety Requirements for Major Projects
Temporary Interior Signage
Construction Waste Management
11-21
11-25
11-25
11-25
11-25
11-25
01-24
11-23
11-25
05-24
07-15
04-22
DIVISION 02 – EXISTING CONDITIONS
02 41 00
02 82 11
02 82 13.13
02 83 33.13
Demolition
Traditional Asbestos Abatement
Glovebag Asbestos Abatement
Lead-Based Paint Removal and Disposal
08-17
01-21
01-21
01-21
DIVISION 03 – CONCRETE
03 30 00
(Short-Form) Cast-in-Place Concrete
01-19
DIVISION 04 – MASONRY – NOT USED
DIVISION 05 – METALS
05 50 00
Metal Fabrications
08-18
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES
06 10 00
06 16 63
06 20 00
Rough Carpentry
Cementitious Sheathing
Finish Carpentry
00 01 10 – Table of Contents - 1
10-17
01-21
01-21
VA Danville Renovate B103 PRRTP Bathrooms
VA Illiana Health Care System
1900 E. Main St., Danville, IL 61832
SECTION NO
Project # 550-25-108
06-01-24
DIVISION AND SECTION TITLES
DATE
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 13 00
07 60 00
07 84 00
07 92 00
Sheet Waterproofing
Flashing and Sheet Metal
Firestopping
Joint Sealants
01-21
01-21
01-21
04-22
DIVISION 08 - OPENINGS
08 11 13
08 71 00
Hollow Metal Doors and Frames
Door Hardware
01-21
03-24
DIVISION 09 – FINISHES
09 05 16
09 22 16
09 29 00
09 30 13
09 51 00
09 91 00
Subsurface Preparation for Floor Finishes
Non-Structural Metal Framing
Gypsum Board
Ceramic/Porcelain Tiling
Acoustical Ceilings
Painting
01-21
06-18
04-20
01-21
12-18
DIVISION 10 – SPECIALTIES
10 14 00
10 21 13
10 21 23
10 26 00
10 28 00
Signage
Toilet Compartments
Cubicle Curtain Tracks
Wall and Door Protection
Toilet, Bath, and Laundry Accessories
01-21
01-21
01-21
01-21
01-21
DIVISION 11 – EQUIPMENT
12 32 00
12 36 00
DIVISION 12 – FURNISHINGS –
The beginning of the document. Download the full file to read on.
Other documents in this bid
- SOL Attachment 3 Sub-contractor Info Consent
- SOL Attachment 4 Past Performance Client Questionnaire
- SOL Attachment 7 SEED PROJECT Wage Determination
- 0002 2026.10.20 full
- 0001 Attachment 1 SOL Attachment 1 SEED PROJECT Statement of Work Renovate Bathrooms B103 RRTP
- 0001 Attachment 4 SOL Attachment 4 Past Performance Client Questionnaire
- 0001 Attachment 5 SOL Attachment 5 SEED PROJECT Specifications
- 0001 Attachment 6 SOL Attachment 6 SEED PROJECT Drawings
- 0001 Attachment 7 SOL Attachment 7 SEED PROJECT Wage Determination
- 0001 Attachment 8 SOL Attachment 8 Contractor Safety and EMR
- 0001 Attachment 9 SOL Attachment 9 VAAR 852.219-75 Certification
- Bid document