National Park Service
GCLA Bullfrog Launch Ramp
GLCA-220829
Preliminary Geotechnical Exploration
Final
February 2023
Prepared by:
Jacobs Government Services Company
Herndon, VA
Contract No. 140P2021D0007
Task Order No. 140P2021F0261
National Park Service
U.S. Department of the Interior
GCLA Bullfrog Launch Ramp
GLCA-220829
List of Figures
List of Tables
List of Appendices
Appendix A – Rock Core Boring Logs
Appendix B – Photolog
Appendix C – Rock Core Photologs
Appendix D – Laboratory Data Sheets
Appendix E – Geologic Maps and Cross-sections
Preliminary Geotechnical Exploration, Final
February 2023
Page i
National Park Service
U.S. Department of the Interior
GCLA Bullfrog Launch Ramp
GLCA-220829
Acronyms and Abbreviations
Acronym
Definition
~
approximately
>
greater than
bgs
below ground surface
ID
identifier
Jacobs
Jacobs Government Services Company
NPS
National Park Service
pcf
pound(s) per cubic foot
psi
pound(s) per square inch
RQD
Rock Quality Designation
UCS
unconfined compressive strength
DISCLAIMER: If using a screen reader, adjustment to your default settings may be required.
Preliminary Geotechnical Exploration, Final
Acronyms and Abbreviations
February 2023
Page ii
National Park Service
U.S. Department of the Interior
GCLA Bullfrog Launch Ramp
GLCA-220829
Chapter 1 – Introduction
This report summarizes the preliminary geotechnical exploration that was conducted for the Glen Canyon Launch Ramp project. The National Park Service proposes to modify or relocate launch ramps at four visitor use areas within Glen Canyon National Recreation Area due to unprecedented low water conditions at Lake Powell in order to develop a rapid response plan to maintain boater access with resilient, long-term, engineered solutions. Users must continue to have access to Lake Powell for recreational activities. The launch ramps serve a public health and safety need to provide safe access to the water as well as protect impacts to natural resources by providing designated access points to the water. The original water elevation for Lake Powell was 3,700 feet. At the time of this report in early 2023, the water level has fallen to 3,522 feet. The Bullfrog Launch Ramp is being relocated from its existing location to the Stanton Creek Area due to low water.
This geotechnical exploration gathered geological and subsurface information at the proposed launch ramp site for the conceptual design and provides geotechnical data to the design-build contractors to assist in their response to the request for proposals for
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Bullfrog
- Attachment 1: Design Build Request for Proposals Bullfrog
- Attachment 3: Schematic Design Basis of Design Rev1
- Attachment 4: GLCA Visitor Use Report
- Attachment 9: Proposal Submission Package BULLFROG
- Attachment 10: SubKPlan Bullfrog
- Attachment 11: Wage Determination BULLFROG
- Sol
- GLCA Bullfrog Solicitation QA 0001
- Sol Amendment 0001
- Sol Amendment 0002