Home / Wastewater Pretreatment Plant Operation and Maintenance… / Document

Attachment A - Performance Work Statement Waste Water Pretreatment Plant Operation and Maintenance

Updated

A PDF document (490 KB) attached to Wastewater Pretreatment Plant Operation and Maintenance Services, from the Bureau of Engraving and Printing. Due Oct 27, 2026, 12:00 PM (UTC-4).

File name: Attachment A - PWS Waste Water Pretreatment Plant Operation and Maintenance_6 Oct 2026.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

PERFORMANCE WORK STATEMENT (PWS)

BUREAU OF ENGRAVING AND PRINTING

DISTRICT CURRENCY FACILITY (DCF)

WASTEWATER PRETREATMENT PLANT OPERATION AND

MAINTENANCE SERVICES

1.0 Background

The Bureau of Engraving & Printing’s (BEP) Facility is a component of the United States Department of the Treasury that designs, engraves, and prints U.S. currency banknotes and other U.S. security products. U.S. currency banknote manufacturing occurs at BEP’s District of Columbia Facility (DCF) located in Washington, DC. BEP’s primary customer is the Federal Reserve Board (FRB). As part of the manufacturing process various industrial wastewater streams are generated as well as storm water streams. These waste streams must be either pretreated through the BEP Wastewater Pretreatment Plant (WWPP) in order to comply with environmental regulations that allow for their discharge into the sanitary sewer or must be otherwise managed in compliance with applicable regulations.

1.1 Objective

The Bureau of Engraving & Printing’s (BEP) Facility located in Washington, DC contains an Industrial Wastewater Pretreatment Plant (WWPP). BEP’s objective is to procure contractor services to manage, operate, maintain supplies and perform maintenance and provide technical support for the Wastewater and Storm Water Programs. The WWPP requires services to support the BEP on a 24/7 basis. The WWPP currently consists of four (4) systems: (1) Wiping Solution Wastewater Pretreatment Plant (WSWPP), (2) Plating Wastewater Pretreatment Plant (PWPP), (3) Grease Trap Wastewater Pretreatment Plant (GTWPP), and (4) Wiping Solution Recycling Plant (WSRP). The WWPP includes an on-site lab and a materials storage area. Refer to Attachments 2, 3, 4, and 5 for descriptions of the four (4) systems as well as Attachment 9 and 10 for listings of the equipment that are part of the WSWPP and PWPP, respectively. The GTWPP may be removed during the course of this contract. In addition to these systems, additional systems are currently being researched that will be included in the scope of this requirement. These processes will be limited to elementary neutralization and/or oil and water separation.

1.2 References

REGULATION/

PUBLICATION

ORGANIZATION/

FEDERAL/STATE/LOC

AL AGENCY

WEBSITE/

LOCATION

Federal, State, Local and Organizational Regulations/ Publications/ Codes All applicable regulations
as prescribed under 29
CFR 1910.

Occupational Safety and
Health Standards (OSHA),
Department of Labor

http://www.osha.gov/

Applicable Standards and codes,

The beginning of the document. Download the full file to read on.

Other documents in this bid