Attachment C Wage Determination
Updated
A PDF document (55 KB) attached to Federal Highway Office Renovations, Carson City Federal Building, from the Public Buildings Service. Due Nov 2, 2026, 4:00 PM (UTC-8).
File name: Attachment C_Wage Determination NV20260090_2026 07 30.pdf
The full file is for paid members, or buy this bid alone.
Preview
"General Decision Number: NV20260090 07/30/2026
State: Nevada
Construction Types: Building
Counties: Nevada Counties of
Carson City
Modification Number
Publication Date
06/22/2026
07/30/2026
SANV2025-001 10/01/2025
Rates
Laborers: Group 1 (All cleanup work of debris,
grounds, ard buiding including windows and
tile; Dumpmen or Spotter (other than asphalt);
Handling ard Servicing of Flares, Watchmen;
Gereral Laborer; Guideposts and Highway Signs;
Guardrail Erection ard Dismantling; Limber,
Brushloader ard Piler; Pavement Marking and
Highway Striping; Tending to portable space
heaters; Profilograph work all types manual, self
propelled or carts; Gabion basket, building,
handling, installation and rigging; Dry set paver
Laborers: Group 2 (Choker setter or Rigger
Fringes
33.51
0.00
0.00
18.44
25.29
13.86
16.61
17.15
0.00
30.66
29.99
47.89
17.58
17.58
19.41
0.00
17.58
17.58
17.58
17.58
39.12
17.58
17.58
17.58
17.58
17.58
17.58
(clearing work only) Pittsburgh; Chipper and
similar type brush shredders; Concrete worker (wet
or dry) all concrete work not listed in Group 3
included but not limited to: concrete forms
stripping, handling, clearning, oiling and moving
to thenext point of installation; Crusher or
Grizzly Tender; Greasing Dowels; Guinea Chaser
(Stakemen); Panel Forms (wood ormetal) handling,
clearning and stripping of Loading and unloading,
Carrying and handling of all rods and materials for
use in reinforcing concrete; Railroad Trackmen
(maintenance, repair or builders); Sloper;
Semi-Skilled Wrecker (salvaging of building
materials other than those listed in Group 3)
Waterproofing work; Epoxy rebar/dowels adn
anchoring dowel baskets; Placement pouring of
concrete including any epoxy resin or similar
materials, rodding, spreading, and tamping
concrete, brooming or brusing, hand application of
curing compunds, applying topping (wet or dry)
colors or grits, and exposed finishes for
architectural work; Concrete patching, dry packing,
chipping, stoning, and grouting; Concrete cold
Whether/rain protection and curing;
Placement/anchoring of all earth
stabilization/filters fabrics; Mechanically
stabilized Earth (MSE) and keystone type retaining
walls rigging, placing, aligning, backfilling and
installation of dead men and any stabilization
Laborers: Group 3 (Asphalt Workers (Ironers,
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Solicitation Federal Highway Office Renovations
- Attachment B Statement of Work FHWA Carson Office Renovation rev2026 09 28
- Attachment D Supplement Statement of Work Documents
- Pre-Bid RFIs
- Amendment Form (SF 30) Solicitation Amendment 1
- Amendment Form (SF 30) Solicitation Amendment 2
- Attachment A Solicitation Form (SF 1442) v2
- Pre-Bid RFIs Round 2
- Amendment Form (SF 30) Solicitation Amendment 3