Pre-Bid RFIs - Round 2

Date: 10/19/2026

Solicitation: 47PD5526Q0051
Project: FHWA Renovations
#

QUESTION

RESPONSE

In response to pre-bid RFIs #18 and #22, the Government clarified that sound masking is required in the common corridor only. Is the 31 intent to install a new standalone system or connect to an existing It is a stand alone system. system? If a new standalone system is required, please confirm whether a contractor-designed system is acceptable.
In response to pre-bid RFIs #6 and #25, the Government
confirmed that one sound-rated door and frame is required for 32 Office 225. Please confirm the required STC rating for the door assembly and provide the door hardware specifications, including locking and keying requirements.

The STC rating for the door and frame is STC 45

Please identify the locations and dimensions of the four roller shades requiring replacement. Also confirm the total number of existing roller shades requiring removal, reinstallation and adjustment per the revised SOW.

This is a placeholder number for proposal purposes. The exact number and location is unknown. This number may change
through contact mod.

No duct modifications are aniticipated and will be avoided at all Please confirm the required framing and acoustic treatment where costs. Since the wall job will be in a tight area, GSA understand the new STC-45 wall jogs around existing ductwork to reach the that this section of wall may not have the same treatment as the structure above. Will any duct modifications or relocation be rest of the wall. I would suggest you clarify your proposal with your required?
approach.