Attachment D - Quality Assurance Energy EQAPS
Updated
A PDF document (9.1 MB) attached to Solicitation: SPE605-26-R-0219 (Korea, Post, Camps & Stations (PC&S) 1.8V), from the Defense Logistics Agency. Due Oct 30, 2026, 9:00 AM (UTC-4).
File name: Attachment D - Quality Assurance Energy EQAPS.pdf
The full file is for paid members, or buy this bid alone.
Preview
SPE605-26-R-0219
ATTACHMENT D
QUALITY ASSURANCE ENERGY E-QAPS
MACLEAN.SARAH.A.1 Digitally signed by
MACLEAN.SARAH.A.1400398441
400398441
Date: 2024.04.11 12:22:48 -04'00'
signed by
KARRAS.JASON.EARL Digitally
KARRAS.JASON.EARLE.1129188177
E.1129188177
Date: 2024.04.11 12:28:51 -04'00'
signed by
KNAPP.RICHARD.BRU Digitally
KNAPP.RICHARD.BRUCE.1027134021
CE.1027134021
Date: 2024.04.11 12:46:02 -04'00'
℉
℉
℉
TABLE I, Sample Retention1
LOCATION
Bulk Tank Cars/Tank
Truck/Intermodal Container
Fuels
Lubricating Oils
Drums4
Shipping Tank(s)
Tanker/Barge/Pipeline
(Composite Line at Custody
Transfer Point)
Tanker/Barge (Composite)
F.O.B. Origin
F.O.B. Destination
Tanker/Barge (Each
Compartment)
F.O.B. Origin
F.O.B. Destination
MINIMUM QUANTITY
RETENTION PERIOD 1
1 gallon (4 liters) 2
0.25 gallons (1 liter) 2
2 gallons (8 liter) (multi-drum
composite) 3
2 gallons (8 liters) for Aviation Turbine
Fuels
1 gallon (4 liters) for all other Fuels,
Lubricating Oils, and Additives
15 days for fuels
45 days for lubricating oils
5 gallon (20 liters) for all fuel types
45 days
2 gallons (8 liters) for Aviation Turbine
Fuels
1 gallon (4 liters) for all other fuels
2 gallons (8 liters)
0.25 gallon (1 liter)
0.25 gallon (1 liter)
45 days
45 days
45 days
Until shore tests on-specification
45 days
Until shore test on-specification
NOTES:
1. Unless otherwise noted in this document or applicable contract, the retention period shall be for the stated number of days after the sample has been taken from the location indicated. 2. If the conveyance is compartmentalized, a proportional sample shall be taken from each compartment. 3. An 8-liter composite sample of each product lot shall be taken from a predetermined number of randomly selected drums IAW Table III of API MPSM, Chapter 8.1 (ASTM D 4057).
4. Applies to DLA Energy managed procurements of products shipped in drums. Does not apply to DLA Aviation managed procurements for packaged products.
ITEM
1.b
1.d
1.e
After Loading
1.f
During
Loading
1.c
Prior to
Loading
1.a
TABLE II, Minimum Sampling and Testing Requirements for Petroleum Products Series 1, tankers and barges1
WHEN TO SAMPLE
LOCATION OF SAMPLE
TYPE OF SAMPLE2
Before acceptance of new materiel
Single Tank Composite or All
and after establishment of new
Each shore storage tank
Levels
batch4
As close to the custody transfer
After line pack but prior to loading
Line Sample
point as possible
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Attachment A - Schedule of Supplies
- Attachment B - Korea Govt Preferred BRP Indexes and Escalators
- Attachment C - Quality Assurance Energy CQAPS
- Attachment E -Provisions and Clauses
- Attachment F - AMPS Role Guide
- Attachment G - Requesting the OET Vendor Role in AMPS Guide
- Attachment H - PCS OET Vendor Guide
- Attachment I - Sample Letter of Commitment and Instructions - Copy
- Solicitation KOREA PC and S 1.8V