Attachment J - Wage Determination
Updated
A PDF document (56 KB) attached to P084 Next Generation Torpedo Integration Lab, Naval Station Newport, Newport RI, from the Department of the Navy. Due Nov 17, 2026, 2:00 PM (UTC-5).
File name: Attachment J - WD RI20260001 10-1-26.pdf
The full file is for paid members, or buy this bid alone.
Preview
"General Decision Number: RI20260001 10/01/2026
State: Rhode Island
Construction Types: Building, Heavy and Highway
Counties: Rhode Island Counties of
Bristol, Kent, Newport, Providence and
Washington
Includes Marine Construction Projects
Modification Number
Publication Date
01/30/2026
05/18/2026
07/30/2026
10/01/2026
ASBE0006-006 09/01/2024
Rates
HAZARDOUS MATERIAL HANDLER (INCLUDES PREPARATION,
WETTING, STRIPPING, REMOVAL SCRAPPING, VACUUMING,
BAGGING & DISPOSING OF ALL INSULATION MATERIALS,
WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM
----------------------------------------------------------------
Fringes
36.63
ASBE0006-008 09/01/2024
Rates
ASBESTOS WORKER/INSULATOR (INCLUDES APPLICATION OF
ALL INSULATING MATERIALS, PROTECTIVE COVERINGS,
COATINGS & FINISHES TO ALL TYPES OF MECHANICAL
----------------------------------------------------------------
Fringes
36.63
BOIL0029-001 01/01/2025
Rates
----------------------------------------------------------------
Fringes
28.82
BRRI0003-001 06/01/2022
Rates
BRICKLAYER, STONEMASON, POINTER, CAULKER & CLEANER..$ 46.86
----------------------------------------------------------------
Fringes
29.14
BRRI0003-002 09/01/2022
Rates
----------------------------------------------------------------
Fringes
30.34
BRRI0003-003 09/01/2022
Rates
---------------------------------------------------------------CARP0330-001 06/02/2025
Fringes
29.61
Rates
DIVER (WHEN NOT DIVING OR TENDING THE DIVER, THE
DIVER AND DIVER TENDER SHALL RECEIVE THE PILEDRIVER
RATE. DIVER TENDERS SHALL RECEIVE $1.00 PER HOUR
ABOVE THE PILE DRIVER RATE WHEN TENDING THE DIVER.)
DIVER TENDER (WHEN NOT DIVING OR TENDING THE DIVER,
THE DIVER AND DIVER TENDER SHALL RECEIVE THE
PILEDRIVER RATE. DIVER TENDERS SHALL RECEIVE $1.00
PER HOUR ABOVE THE PILE DRIVER RATE WHEN TENDING
THE DIVER.)
CARPENTER: INCLUDES SOFT FLOOR LAYER (WORK ON
FREE-STANDING STACKS, CONCRETE SILOS & PUBLIC
UTILITY ELECTRICAL POWER HOUSES, WHICH ARE OVER 35
FT. IN HEIGHT WHEN CONSTRUCTED: $.50 PER HOUR
ADDITIONAL. WORK ON EXTERIOR CONCRETE SHEAR WALL
GANG FORMS, 45 FT. OR MORE ABOVE GROUND ELEVATION
PILEDRIVER (WORK ON FREE-STANDING STACKS, CONCRETE
SILOS & PUBLIC UTILITY ELECTRICAL POWER HOUSES,
WHICH ARE OVER 35 FT. IN HEIGHT WHEN CONSTRUCTED:
$.50 PER HOUR ADDITIONAL. WORK ON EXTERIOR CONCRETE
SHEAR WALL GANG FORMS, 45 FT. OR MORE ABOVE GROUND
ELEVATION OR ON SETBACK: $.50 PER HOUR ADDITIONAL.
THE DESIGNATED PILEDRIVER, KNOWN AS THE ""MONKEY"":
WELDER (WORK ON FREE-STANDING STACKS, CONCRETE
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Attachment C- Construction Experience Project Data
- Attachment D- Past Performance Questionnaire
- Attachment E- Historical Small Business Utilization
- Attachment F-Small Business Participation Commitment
- Attachment G - Individual SB Subcontracting Plan
- Attachment H -Price Proposal Form
- Attachment I - SECNAV FORM 5512
- Attachment J - Wage Determination
- NUWC P-1016 - Specifications
- NUWC P084 - Specifications
- Solicitation
- Amendment 1