Attachment VIII EQAPs Redacted
Updated
A PDF document (2.1 MB) attached to Government-Owned, Contractor-Operated (GOCO) Fuel Services at NAWS China Lake, California, from the Defense Logistics Agency. Due Nov 9, 2026, 5:00 PM (UTC-5).
File name: Attachment VIII EQAPs Redacted.pdf
The full file is for paid members, or buy this bid alone.
Preview
SUPPLEMENTAL QUALITY ASSURANCE PROVISION (SQAP)
REVISIONS
REV
DESCRIPTION
ENERGY QAP E28
DATE
APPROVED
February 2022
E28 CONTRACTOR INSPECTION RESPONSIBILITIES (STORAGE)
(a) Inspection and tests by the Government of services, facilities, and equipment specified within this contract does not relieve the Contractor from responsibility to meet all requirements of the contract. (b) The Contractor shall furnish personnel, facilities, and equipment on-site to accomplish the following routine tests and procedures. These onsite resources may be provided by Contractor personnel or by a commercial source action on behalf of the Contractor. The Quality Representative will not be responsible for performing any of these services for the Contractor. (1) Sampling of storage tanks, shipments and receipts in accordance with ASTM D4057, Standard Practice for Manual Sampling of Petroleum and Petroleum Products (API Manual of Petroleum Measurement Standards (MPMS), Chapter 8.1); (2) Retaining of product composite samples from shipments and receipts as follows:
MINIMUM
METHOD OF SHIPMENT
MINIMUM QUANTITY
RETENTION PERIOD
Pipeline
20 liters
60 days
Tanker/Barge
Parcel Composite
Each compartment
20 liters
0.5 liters
90 days
90 days
Navy Fleet Oilers/Vessels
10 liters
60 days
Tank Truck/Car
1 liter
15 days
NOTE: After the minimum retention period, samples shall be tested for Appearance, Color (Visual), API Gravity/Density and Flash Point and, if found to be on-specification, shall be returned to like Government stock on-site. Sample containers may be reused if properly cleaned.
(3) Determining the presence of water in storage tanks, shipments and receipts. Ensure that accurate water cuts are obtained by means of a water indicating paste conforming to MIL-W-83779B. Two suggested sources are Stewart Hall Chemical Testmaster Water Indicating Paste or Sartomer Sar Gel Water Indicating Paste (see Note 2 below);
(4) Determining Density at 15 degrees Celsius or API gravity of products by ASTM D1298 or ASTM D4052 (see Note 2 below); (5) Determining the temperature of products by the API MPMS, Chapter 7 (see Note 2 below); (6) Determining the Appearance of applicable products using ASTM D4176, Procedure l (see Note 2 below); (7) Determining the visual color of products.
(8) Determining the Flash Point of applicable products using test methods cited in the appropriate product specification (see Note 2 below); (9) Conversion of gross to net gallonage (liters);
(10) Determining the percentage (volume) of fuel system icing inhibitor (FSII) by means of a portable refractometer in accordance with ASTM D
The beginning of the document. Download the full file to read on.
Other documents in this bid
- ATTACH IV PP Consent Form
- ATTACH V PP References
- ATTACHMENT I PPF CHINA LAKE
- ATTACHMENT II NAWS China Lake Performance Work Statement
- ATTACHMENT VI 2025-264 CBA Redacted
- Attachment III Past Performance Questionnaire
- Attachment VII Navy Quality Assurance Surveillance Plan
- China Lake Request for Proposal
- China Lake Synopsis (Combined)
- Attachment IX - NAWS China Lake Performance Work Statement JP