Home / Target Service Shield Machining and Welding / Document

Bid document

Updated

A PDF document (715 KB) attached to Target Service Shield Machining and Welding, from the Department of Energy. Due Nov 24, 2026, 4:00 PM (UTC-5).

File name: MPEX-00-ENG-002-A3.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

Vacuum Handbook Appendix 3:
Knife Edge Flange Bolt Torque and Tightening
Requirements

MPEX-00-ENG-002-A3

MATERIAL PLASMA EXPOSURE EXPERIMENT

(MPEX)

Prepared by

OAK RIDGE NATIONAL LABORATORY

Oak Ridge, TN 37831-6283
Managed by

UT-BATTELLE, LLC

For the

US DEPARTMENT OF ENERGY

under contract DE-AC05-00OR22725

This report was prepared as an account of work sponsored by an agency of the United States government. Neither the United States government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise, does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States government or any agency thereof. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States government or any agency thereof.

Vacuum Handbook Appendix 3:
Knife Edge Flange Bolt Torque and Tightening Requirements for the
Material Plasma Exposure Experiment Project

MPEX-00-ENG-002-A3

Author(s):

Digitally signed by Jeffrey Ulreich
Date: 2023.04.28
13:18:15 -04'00'
Jeffrey Ulreich, Lead Engineer, MPEX VS Vacuum Vessels
Date
Reviewer(s):

Digitally signed by Aftab Hussain
Aftab
Hussain
Date: 2023.05.08
16:17:05 -04'00'
Aftab Hussain, MPEX Lead Engineer

Date

Approver(s):

Digitally signed by Adam M. Aaron
Date: 2023.05.08
17:15:31 -04'00'
Adam M. Aaron, CAM, Vacuum Systems
Date
Distribution:
Mike Kaufman, Plasma Source and Heating CAM
Ted Boyd, Lead Engineer for PMI and TEC

Vacuum Handbook Appendix 3:
Knife Edge Bolt Torque and Tightening Requirements
for the
Material Plasma Exposure Experiment Project

MPEX-00-ENG-002-A3

Revision History

REVISION TYPE

Revision

Date

April 28, 2023

DESCRIPTION OF CHANGE

Initial Issue

Major

Minor

☐

☐

☐

☐

☐

☐

TABLE OF FIGURES

BOLT TORQUE

Bolt tightening torques and patterns are necessary to assure a leak tight vacuum seal on Conflat (CF) flanges. All fasteners and threads will be precision cleaned. This requires that lubrication is added to the threads to prevent galling. The following lubricants may be used on fasteners for MPEX Device CF flanges.

The beginning of the document. Download the full file to read on.

Other documents in this bid