VACUUM HANDBOOK (MPEX-00-ENG-002) PRIOR TO WELDING.

2. AFTER CLEANING, ALL COMPONENTS SHALL BE HANDLED ACCORDING TO SECTION 3.10 OF

THE MPEX VACUUM HANDBOOK (MPEX-00-ENG-002) TO AVOID CONTAMINATION OF WELDS.

3. ALL COMPONENTS, FILLER MATERIALS, AND WELDED JOINTS SHALL BE NON-MAGNETIC

D

4. SUPPLIER SHALL MANUFACTURE A WELD SAMPLE TO VERIFY THAT THE MAGNETIC

AND USED FOR BOTH THE SAMPLE AND PRODUCTION ASSEMBLIES.

PERMEABILITY REQUIREMENTS ARE MET.

5. ALL VT (VACUUM TIGHT) WELDS MUST PASS A HELIUM LEAK TEST OF 1 X 10^-9 STD

REV TYPE

ACCORDING TO SECTION 3.4 OF THE MPEX VACUUM HANDBOOK (MPEX-00-ENG-002) AFTER

A WELD PROCEDURE WITH PROCESS SETTINGS

NO REPRESENTATION OR WARRANTY, EXPRESSED OR IMPLIED, IS MADE AS TO THE

ACCURACY, COMPLETENESS OR USEFULNESS OF THE INFORMATION OR STATEMENTS CONTAINED

IN THESE DRAWINGS, OR THAT

THE DISCLOSURE OF ANY INFORMATION, APPARATUS, METHOD OR PROCESS DISCLOSED IN THESE DRAWINGS MAY NOT INFRINGE PRIVATE RIGHTS OF

OTHERS. NO LIABILITY IS ASSUMED WITH RESPECT TO THE

USE OF, OR FOR DAMAGES RESULTING FROM THE USE OF, ANY INFORMATION, APPARATUS,

METHOD OR PROCESS DISCLOSED IN THESE DRAWINGS. DRAWINGS MADE AVAILABLE FOR

INFORMATION TO BIDDER ARE

NOT TO BE USED FOR OTHER PURPOSES AND ARE TO BE RETURNED UPON REQUEST OF THE

FORWARDING CONTRACTOR.

NOTES:

1. ALL COMPONENTS SHALL BE PRECISION CLEANED ACCORDING TO SECTION 4 OF THE MPEX

REVISIONS

DESCRIPTION OF CHANGE

ORIGINAL ISSUE

DES DET CK ENG CAM

DATE

8/23/2023

CC CC DO TB AA

WELDING.

D

SHALL BE DOCUMENTED

CC/SEC HELIUM PERFORMED ACCORDING TO ASTM E498-95, STANDARD TEST METHODS FOR

LEAK DETECTION.

6. SUPPLIER SHALL MAINTAIN WELD PROCEDURE AND INSPECTION RECORDS. 7. WELD PROCEDURE AND PERFORMANCE QUALIFICATIONS PER AWS B2.1/2.IM:2014.

8. WELD QUALITY REQUIREMENTS OF AWS D17.1/D17.1M (FUSION WELDING) SPECIFICATION

FOR CLASS A WELDS MUST BE MET.

WELDS MUST BE VISUALLY INSPECTED.

9. WELD SYMBOLS PER ANSI/AWS A2.4.

C

⫽ .002 A

C

VT

(2.039)
(.664)

A

B

MPEX-04-DES-05-A548

SH

R.25

AFTER

WELDING

A

ALL SURFACES

SEE DETAIL

SECTION

A-A

DWG NO.

DETAIL

SCALE 2:1

A

MPEX-04-DES-05-A563

TARGET SHIELD EX-BONDED SHORT, COVER RELIEF

MPEX-04-DES-05-A560

TARGET SHIELD WELDMENT

FIND

QTY
NO.

PART OR IDENTIFYING NUMBER

DESCRIPTION OR NOMENCLATURE

QUALITY

VERIFICATION

DOCUMENTS REQUIRED

A

DRAWING PACKAGE I.D.

MPEX-04-DES-05-A550

MATERIAL MILL TEST REPORT

LEAK TEST REPORT

CLEANING CERT

WELD / BRAZE INSPECTION REPORT

HEAT TREAT REPORT (W/CHART)

DIMENSIONAL REPORT

MATERIAL SELLER CERT

FUNCTIONAL TEST REPORT

DEVIATION REQUEST

NONCONFORMANCE REPORT

QA REP

DIMENSIONING AND TOLERANCING IN

ACCORDANCE WITH ASME Y14.5, 2018