Preview
MPEX-04-SOW-604-R0
Statement of Work for a
Target Service Shield
for the
MATERIAL PLASMA EXPOSURE EXPERIMENT
(MPEX)
Prepared by
OAK RIDGE NATIONAL LABORATORY
Oak Ridge, TN 37831-6283
Managed by
UT-BATTELLE, LLC
For the
US DEPARTMENT OF ENERGY
under contract DE-AC05-00OR22725
This report was prepared as an account of work sponsored by an agency of the United States government. Neither the United States government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise, does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States government or any agency thereof. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States government or any agency thereof.
MPEX-04-SOW-604-R0
Statement of Work for a Target Service Shield
for the
Material Plasma Exposure Experiment Project
MPEX-04-SOW-604
Reviewers:
Digitally signed by Laura Parmley
Laura
Parmley
Date: 2026.08.20
07:38:07 -04'00'
Laura Parmley, TPO
Date
Digitally signed by Misty Magill
Misty
Magill
Date: 2026.08.24
08:00:35 -04'00'
Misty Magill, Procurement Officer
Date
Digitally signed by Milena Keys
Milena
Keys
Date: 2026.08.24
10:12:54 -04'00'
Milena Keys, Quality Assurance Representative
Date
Digitally signed by Muhammad Aftab Hussain
Muhammad
Aftab
Hussain
11:41:48 -04'00'
Aftab Hussain, MPEX Lead Engineer
Date
signed by Not applicable for this document
Not applicable for this document Digitally
Date: 2026.08.25 02:39:10 -04'00'
Doug Curry, MPEX Operations Lead
Approver:
Digitally signed by Aaron, Adam
Date: 2026.08.25
09:03:32 -04'00'
Adam Aaron, CAM Vacuum Systems, TPO
Date
Distribution:
Phil Ferguson, MPEX Project Director
Robyn Rose, MPEX Project Manager
Material Plasma Exposure Experiment
Oak Ridge National Laboratory
MPEX-04-SOW-604-R0
Statement of Work for a Target Service Shield
for the
Material Plasma Exposure Experiment Project
MPEX-04-SOW-604
Revision History
Revision
Date
7/2026
DESCRIPTION OF CHANGE
The beginning of the document. Download the full file to read on.