NUWC P-084
NEWPORT NAVAL STATION, NEWPORT, RI
AMENDMENT 006
OCTOBER 2026
SECTION 01 33 00
SUBMITTAL PROCEDURES
08/18, CHG 4: 02/21
PART 1
1.1
1.1.1
GENERAL
SUMMARY
Submittal Information
The Contracting Officer may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective sections. Each submittal is to be complete and in sufficient detail to allow ready determination of compliance with contract requirements.
Units of weights and measures used on all submittals are to be the same as those used in the contract drawings.
1.1.2
Project Type
The Contractor's Quality Control (CQC) System Manager are to check and approve all items before submittal and stamp, sign, and date indicating action taken. Proposed deviations from the contract requirements are to be clearly identified. Include within submittals items such as: Contractor's, manufacturer's, or fabricator's drawings; descriptive literature including (but not limited to) catalog cuts, diagrams, operating charts or curves; test reports; test cylinders; samples; O&M manuals (including parts list); certifications; warranties; and other such required submittals.
The Contractor and the Designer of Record (DOR), if applicable, are to check and approve all items before submittal and stamp, sign, and date indicating action taken. Proposed deviations from the contract requirements are to be clearly identified. Include within submittals items such as: Contractor's, manufacturer's, or fabricator's drawings; descriptive literature including (but not limited to) catalog cuts, diagrams, operating charts or curves; test reports; test cylinders; samples; O&M manuals (including parts list); certifications; warranties; and other such required submittals.
1.1.3
Submission of Submittals
Schedule and provide submittals requiring Government approval before acquiring the material or equipment covered thereby. Pick up and dispose of samples not incorporated into the work in accordance with manufacturer's Safety Data Sheets (SDS) and in compliance with existing laws and regulations.
1.2
1.2.1
DEFINITIONS
Submittal Descriptions (SD)
Submittal requirements are specified in the technical sections.
SECTION 01 33 00
Examples
NUWC P-084
NEWPORT NAVAL STATION, NEWPORT, RI
AMENDMENT 006
OCTOBER 2026
and descriptions of submittals identified by the Submittal Description (SD) numbers and titles follow:
SD-01 Preconstruction Submittals
Submittals that are required prior to or commencing with the start of
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Attachment C- Construction Experience Project Data
- Attachment D- Past Performance Questionnaire
- Attachment E- Historical Small Business Utilization
- Attachment F-Small Business Participation Commitment
- Attachment G - Individual SB Subcontracting Plan
- Attachment H -Price Proposal Form
- Attachment I - SECNAV FORM 5512
- Attachment J - Wage Determination
- NUWC P-1016 - Specifications
- NUWC P084 - Specifications
- Solicitation
- Amendment 1