Home / Replace Fisher House 1 HVAC System / Document

Bid document

Updated

A PDF document (185 KB) attached to Replace Fisher House 1 HVAC System, from the Department of Veterans Affairs. Due Oct 30, 2026, 1:00 PM (UTC-5).

File name: P01 - 33CS-64SI.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

PREMIERLINK™

Retrofit Rooftop Controller
Version 2.0

Mounting Instructions
Part Number 33CSPREMLK
IMPORTANT: This document contains PremierLink controller mounting information only. Refer to the Installation, Start-Up, and Configuration manual
for PremierLink controller wiring and installation
configuration procedures.

GENERAL

The PremierLink controller is a field retrofit rooftop control compatible with the Carrier Comfort Network® (CCN) system. This control is designed to allow users the access and ability to change factory-defined settings, thus expanding the function of the standard unit control board. The complete PremierLink package (part number 33CSPREMLK) consists of a rooftop control circuit board with plastic cover and label, wire harness, spade connectors, wire nuts and 4 mounting screws. Carrier’s diagnostic standard tier display tools such as System Pilot™ or Touch Pilot™ device can be used with the PremierLink controller. Access is available via an RJ-14 connection or a 3-wire connection to the communication bus. User interfaces available for use with the CCN system are PC’s equipped with Carrier interface software such as Service Tool, ComfortVIEW™, or ComfortWORKS® software. When used
as part of the CCN, other devices such as the CCN data transfer or Comfort Controller can read data from or write data to the PremierLink retrofit controller.

TOOLS REQUIRED

Phillips head mechanical screwdriver or battery operated drill with Phillips head bit.

INSTALLATION

Location — The PremierLink controller should be located inside one of the available service access panels of the unit. Be sure the location selected prevents moisture and rain from coming into contact with the circuit board.
Select a location which will be safe from water damage and allow sufficient access for service and wiring. For service access, there should be at least 6 in. of clearance between the front of the PremierLink controller and adjacent surfaces. Be sure to leave 1/2 in. clearance in front of RJ-14 connector for attaching RJ-14 cable from a CCN device. A field-supplied right angle 6-pin RJ-14 connector can be attached if necessary. NOTE: If the PremierLink controller must be installed in a location where there is not easy access to CCN connectors, a remote connection kit (part number 33CSREMCCN) can be
ordered.

Mounting — Perform the following steps to mount the

PremierLink controller:
1. Remove plastic cover by gently squeezing the middle of longer sides of the cover and pull away from the board.

The beginning of the document. Download the full file to read on.

Other documents in this bid