Bid document
Updated
A PDF document (723 KB) attached to Building 13 Stair and Roof Replacement at Castle Point VAMC, from the Department of Veterans Affairs. Due Nov 10, 2026, 10:00 AM (UTC-5).
File name: ASB-100.pdf
The full file is for paid members, or buy this bid alone.
Preview
ROOF ASBESTOS ABATEMENT PLAN
1/8" = 1'-0"
ASBESTOS ABATEMENT LEGEND
ASBESTOS ABATEMENT CONTRACTOR RESPONSIBLE FOR REMOVAL AND
DISPOSAL OF ACM TAR VAPOR BARRIER. REMOVALS SHALL INCLUDE ALL
NON-ACM ROOFING AND INSULATION LAYERS TO THE NON-ACM WOOD DECK
BELOW.
ASBESTOS ABATEMENT CONTRACTOR RESPONSIBLE FOR REMOVAL AND
DISPOSAL OF ACM FLASHING TAR ON NON-ACM BRICK FACADE.
REFER SPECIFICATION 020800 - SECTION 3.17 FOR A FURTHER DESCRIPTION OF THE ASBESTOS ABATEMENT WORK REQUIREMENTS.
R
ES
S
O NO
PR
N
ST T F
IN
R O
T
U R
C
TI
O
N
100%
65% CONSTRUCTION DOCUMENTS
70 South Franklin Street, Wilkes-Barre, PA
18701
1376 Route 9
Wappingers Falls, NY 12590
Tel: 845-298-6031
C
570 | 824-6340 [email protected] edpons.com
PR
O
G
QUALITY ENVIRONMENTAL
SOLUTIONS & TECHNOLOGIES, INC.
EXPIRES 11-30-2028
/
/2
FE PROJECT NO: 25-126
22 Mulberry St., Suite 2A,
Middletown, NY 10940
t 845-343-1481; fx 855-320-8735
ENGINEERING LLP
www.fellp.com
181 Church St., Suite 100,
Poughkeepsie, NY 12601
t 845-454-9704; fx 855-320-8735
ASB-100
03/20/26
The beginning of the document. Download the full file to read on.
Other documents in this bid
- VA CP Bldg 13 100pct S-S Sub Part1
- VA CP Bldg 13 100pct S-S Sub Part2
- Brick and Tuckpointing Castle Point
- Specifications Manual
- VA Notice OF LIMITATIONS ON SUBCONTRACTING-CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION
- FAR 52.225-2 BUY AMERICAN CERTIFICATE
- 0001 amendment
- Castle Point Bldg13 Pre-Bid RFIs responses