ROSS SPRINGS-RED CANYON WATERLINE REPLACEMENT

1240LT27Q0022
Description –
A.

This project includes the replacement of 4” asbestos cement pipe (abandoned in place) with 4” HDPE water main and associated valves and connections to laterals.

B.

The work includes;
1.

Installation of 4450 linear feet of 4” HDPE pipeline, most of which will be shallow bury or laid on cleared ground and covered with imported fill from a government source.

2.

Cover an additional 1150 linear feet of existing pipeline with imported fill from a government source.

3.

Installation of 2 combination air-vacuum valves with utility boxes.

4.

Installing associated valves, daylight drains, and pumpout drains; and connecting to existing lateral mains and services.

This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued.
Solicitation number 1240LT27Q0022 is issued as a Request for Quotation (RFQ) for Ross Springs Waterline Replacement.
This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 237110 The small business size standard is $45 This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency.

SCHEDULE OF ITEMS

ROSS SPRINGS-RED CANYON WATERLINE REPLACEMENT

Final (06/26/2026)

ITEM

NUMBER

DESCRIPTION

METHOD

OF MEAS

UNIT

QUANTITY

PRICE

TOTAL

BASE BID

011900-1

Mobilization

LSQ

LS

Lump Sum

024102-1

Removal and Disposal of Existing Structures

LSQ

LS

Lump Sum

133403-1

Utility Box - Concrete, 48" Dia. w/ Air-Vacuum Relief Valve

AQ

EA

DQ

LF

DQ

LF

DQ

LF

4475

221100-1
221100-2
221100-3

Pipeline - 1.5" HDPE, 250 PSI with Heat Fusion Joints,
Including Trench
Pipeline - 2" HDPE, 250 PSI with Heat Fusion Joints,
Including Trench
Pipeline - 4" HDPE, 250 PSI with Heat Fusion Joints,
Including Trench

221100-4

Pipe Sleeve - 5" GSP

DQ

LF

221100-5

Daylight Drain - 1" Screened

AQ

EA

221100-6

Daylight Drain - 1.5" Screened

AQ

EA

221100-7

Daylight Drain - 1.5" Screened, w/ Ball Valve (at Fire Hydrant)

AQ

EA

221100-8

Pumpout Drain - 1"

AQ

EA

221100-9

Pumpout Drain - 1.5"

AQ

EA

221102-1

Curb Box Only (Over Existing 1" Metal Valve)

AQ

EA

221102-2

Curb Box Only (Over Existing 2" Metal Valve)

AQ

EA

221102-3

Curb Box Only (Over Existing 4" Metal Valve)

AQ

EA

The beginning of the document. Download the full file to read on.