Home / Ross Springs Waterline Replacement / Document

Plans

Updated

A PDF document (5.7 MB) attached to Ross Springs Waterline Replacement, from the Forest Service. Due Nov 21, 2026, 3:00 PM (UTC-7).

File name: C04d Plans 1240LT27Q0022.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

INDEX OF SHEETS

United States Department of Agriculture
Forest Service

UTAH

DAGGETT COUNTY

R-4 INTERMOUNTAIN REGION

ASHLEY NATIONAL FOREST

FLAMING GORGE RANGER DISTRICT

SHEET

DWG

G-1

COVER SHEET

SHEET TITLE

W-1

SITE OVERVIEW, GENERAL NOTES, AND SURVEY CONTROL

W-2

WATERLINE PLAN AND PROFILE - STA. 0+00 TO 13+00

W-3

WATERLINE PLAN AND PROFILE - STA.13+00 TO 26+00

W-4

WATERLINE PLAN AND PROFILE - STA. 26+00 TO 39+00

W-5

WATERLINE PLAN AND PROFILE - STA. 39+00 TO 52+00

W-6

WATERLINE PLAN AND PROFILE - STA. 52+00 TO 64+00

D-1

AIR-VACUUM RELIEF VALVE DETAILS

D-2

TRENCH / COVER, VALVES, AND VALVE BOXES DETAILS

D-3

SYSTEM DRAINS AND LOCATING SYSTEM DETAILS

PROJECT DESCRIPTION

THE PROJECT CONSISTS OF THE REPLACEMENT OF 4” ASBESTOS CEMENT PIPE

(ABANDONED IN PLACE) WITH 4” HDPE WATER MAIN, AND ASSOCIATED VALVES AND

CONNECTIONS TO LATERALS, ON THE ROSS SPRINGS PUBLIC WATER SYSTEM ON THE

FLAMING GORGE RANGER DISTRICT OF THE ASHLEY NATIONAL FOREST. SPECIFICALLY,

THIS PROJECT FOCUSES ON THE LOWER 1.1 MILES OF THE WATER SYSTEM SERVING

THE RED CANYON CAMPGROUNDS AND VISITOR CENTER. WORK INCLUDES:

1. INSTALLING 4450 LINEAR FEET OF 4” HDPE PIPELINE, MOST OF WHICH IS

SHALLOW BURY OR LAID ON CLEARED GROUND AND COVERED WITH IMPORTED

FILL FROM A GOVERNMENT SOURCE.

ROSS SPRINGS-RED CANYON

WATERLINE REPLACEMENT

2. COVER AND ADDITIONAL 1150 LINEAR FEET OF EXISTING PIPELINE WITH

IMPORTED FILL FROM A GOVERNMENT SOURCE.
3. INSTALLING 2 COMBINATION AIR-VAC VALVES WITH UTILITY BOXES. 4. INSTALLING ASSOCIATED VALVES, DAYLIGHT DRAINS, AND PUMPOUT DRAINS; AND CONNECTING TO EXISTING LATERAL MAINS AND SERVICES.

STOCKPILED

BORROW SOURCE

6/30/26 10:25 KCARNES X:\ASHLEY\ROSS.WATERLINE.REPLACEMENT_2026\DRAWINGS\01_G1_TITLE_SHEET.DWG;

FLAMING GORGE RANGER

DISTRICT OFFICE

MANILA, UT

PROJECT START

RED CANYON

PROJECT END

RECOMMENDED BY:

Cathleen Christensen

FOREST ENGINEER

VICINITY MAP

TRAVEL DIRECTIONS:

FROM THE FLAMING GORGE RANGER DISTRICT OFFICE, TRAVEL SOUTH ON UT HIGHWAY 44 TOWARD VERNAL, UT FOR 24.5 MILES. TURN LEFT ONTO RED CANYON ROAD (FS 095), HEADING NORTHEAST FOR 0.8 MILES, THEN TURN LEFT ON FOREST ROAD 372 FOR 400' TO THE SOUTH END OF THE PROJECT. CONTINUE ON RED CANYON ROAD TO THE END OF THE ROAD NEAR THE NORTH END OF THE PROJECT.

COORDINATES: 40° 52.977' N, 109° 32.618' W

ELEVATION: 7450 FEET

FOREST LOCATION

DATE

Lena Rux

DISTRICT RANGER

DATE

Kristy Groves

FOREST SUPERVISOR

DATE

APPROVED:

Kevin Bourne

DIRECTOR OR DEP. DIR. OF ENGINEERING

DATE

SHEET 1

OF 10

CONTROL POINTS TABLE

RED CANYON

OVERLOOK

VISITOR CENTER

CONTROL

POINT #

NORTHING

EASTING

ELEVATION

RED CANYON

The beginning of the document. Download the full file to read on.

Other documents in this bid