INDEX OF SHEETS
SHEET
United States Department of Agriculture
Forest Service
SHEET TITLE
DATE
G-01
NOTES
06/29/26
C-01
PLAN
06/29/26
C-02
FENCE PROFILE 2.5IN
06/29/26
C-03
HITCHING RAIL
06/29/26
IDAHO
CARIBOU COUNTY
(R04) INTERMOUNTAIN REGION
CARIBOU-TARGHEE NATIONAL FOREST
WESTSIDE RANGER DISTRICT
7/2/26 20:24 MARYJENKINS C:\USERS\MARYJENKINS\ONEDRIVE - USDA\DOCUMENTS\7300BUILDINGSSTRUCTURES_C-T\BIG SPRINGS CG HORSE CORRAL\CIVIL3D_2022\BIGSPRINGSCG_HORSECORRAL_260526.DWG;
0415 INC NEW BIG SPRINGS
HORSE CORRAL REPLACEMENT PROJECT
Westside Ranger District
4350 Cliffs WY
Pocatello, ID 83204
Big Spring Campground
Forest Rd 026
Bancroft, ID 83217
PROJECT LOCATION MAP
APPROVED:
STEVEN JENKINS
TRAVEL DIRECTIONS:
FOREST ENGINEER
FROM WESTSIDE RANGER DISTRICT BOARD I-15 SOUTH, TRAVEL FOR 33 MILES. TAKE EXIT 47 FOR US-30 E TOWARD I-15BL/MCCAMMON/SODA SPRINGS/MONTPELIER. TURN EAST/LEFT AND CONTINUE FOR 9 MILES. TURN LEFT ONTO BLASER RD AND CONTINUE FOR 7 MILES. CONTINUE ONTO FSR 036 FOR 6 MILES. TURN RIGHT ONTO FSR 024 FOR 0.1 MILES AND TURN LEFT ONTO BIG SPRINGS CAMPGROUND HORSE CORRALS.
DISTRICT RANGER
DANIEL BARTEL
Digitally signed by STEVEN JENKINS
Date: 2026.08.13 08:25:23 -06'00'
DATE
Digitally signed by DANIEL BARTEL
Date: 2026.08.13 09:42:10 -06'00'
DATE
42.767332, -112.095177
FOREST LOCATION MAP
SHEET 1
OF 9
PROJECT DESCRIPTION
THE PROJECT CONSISTS OF:
·
·
·
··
··
SUPPLY AND INSTALL STEEL OIL PIPE FOR THREE HORSE CORRALS. SUPPLY AND INSTALL CONCRETE FOR POST EMBEDMENT.
OPTION ITEMS AS ADDED BY AWARD OR CONTRACT MODIFICATION.
THREE ADDITIONAL HORSE CORRALS
HITCHING RAIL
United States Department of Agriculture
Forest Service
(R04)
PROJECT NOTES:
·
7/2/26 20:24 MARYJENKINS C:\USERS\MARYJENKINS\ONEDRIVE - USDA\DOCUMENTS\7300BUILDINGSSTRUCTURES_C-T\BIG SPRINGS CG HORSE CORRAL\CIVIL3D_2022\BIGSPRINGSCG_HORSECORRAL_260526.DWG;
·
·
·
·
·
·
·
INTERMOUNTAIN REGION
THOROUGH CLEANING OF ALL EQUIPMENT IS INCIDENTAL TO 15101 AND SHALL BE PERFORMED BY CONTRACTOR, PRIOR TO ENTRY INTO FEDERAL LANDS. INSPECTION OF ALL THOROUGH CLEANED EQUIPMENT IS REQUIRED AND WILL BE PERFORMED BY THE FS WITH A MINIMUM OF 7 BUSINESS DAYS NOTIFICATIONS TO THE CO/COR. POSTS AND RAILS SHALL BE CONSTRUCTED OF RECYCLED STEEL OIL PIPE OR APPROVED EQUIVALENT. CONTRACTOR SHALL VERIFY AND PROTECT ALL EXISTING UTILITIES AND ADJACENT FEDERAL PROPERTY. CONNECTIONS AS DEPICTED IN DRAWINGS OR EQUIVALENT.
FIELD WELDS ARE OPTIONAL AND MUST BE DEPICTED ON SHOP DRAWINGS AND APPROVED BY FS PRIOR TO CONSTRUCTION.