Schedule of Items
Updated
A PDF document (233 KB) attached to Big Springs Horse Corral Replacement, from the Forest Service. Due Oct 29, 2026, 5:00 PM (UTC-6).
File name: C04a - Schedule of Items - 1240LT26Q0179.pdf
The full file is for paid members, or buy this bid alone.
Preview
USDA Forest Service
SCHEDULE OF ITEMS
0415 INC NEW Big Springs Horse Corral Replacement
ITEM
NUMBER
DESCRIPTION
Date:
METHOD
OF MEAS
UNIT
8/13/2026
QUANTITY
011900
Mobilization
LSQ
Lump Sum
055000-1
60' X 20' FOUR-RAIL DIVIDED STEEL CORRAL W/CONCRETE FOOTINGS*
LSQ
Lump Sum
PRICE
TOTAL
Subtotal
$
Total with both
Option Items
$
OPTION ITEMS:
055000-2
OPTIONAL 1 ADDITIONAL CORRAL (STEEL PIPE AND CONCRETE INCLUDED)
LSQ
Lump Sum
055000-3
OPTIONAL HITCHING RAIL
LSQ
Lump Sum
* 60' X 20' FOUR-RAIL DIVIDED STEEL CORRAL W/CONCRETE FOOTINGS INCLUDES 174 LF OF POST, 800 LF OF RAIL, AND 1 CY CONCRETE.
1. Base and Option Line Items = 61 Calendar Days
Options may be awarded at time of base line items, or may be awarded up to 30 days. 2. Payment for bond premiums will be required in accordance with FAR 52.228-15. In accordance with FAR Clause 52.232-5, Payments Under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under Base Item 011900 – Mobilization.
The beginning of the document. Download the full file to read on.