0415 INC NEW Big Springs Horse Corral Replacement
Specification Table of Contents

SECTION 011250 - MEASUREMENT AND PAYMENT

SECTION 011400 - WORK RESTRICTIONS

SECTION 011900 - MOBILIZATION

SECTION 013100 - PROJECT MANAGEMENT AND COORDINATION

SECTION 013300 - SUBMITTAL PROCEDURES

SECTION 014100 - QUALITY CONTROL

SECTION 017700 - CLOSEOUT PROCEDURES

SECTION 023701 - SEDIMENT AND EROSION CONTROL MEASURES

SECTION 024100 - WASTE MATERIAL DISPOSAL

SECTION 033020 - CONCRETE FROM PACKAGED DRY MIX FOR MINOR

STRUCTURES

SECTION 057300 - RECYCLED STEEL OIL PIPE CORRAL SYSTEM

SECTION 311000 - CLEARING AND GRUBBING

SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

000001-1

Section C - Description/Specifications/Statement of Work

GENERAL SPECIFICATIONS

0415 INC NEW Big Springs Horse Corral Replacement
__% Submittal - Date
1.1

SCOPE OF CONTRACT

A.

This project includes supply and installation of steel oil pipe for three horse corrals and concrete for post embedment, including temporary traffic control. Local traffic shall be closed during construction with temporary traffic control measures in place. Including sign stating horse corrals are closed to public for the duration of project.

B.

Optional work that may be awarded includes all work described above associated with: 1.
2.

C.
1.2
A.

1.3
A.

Quantities associated with these options are identified in the Schedule of Items.

PROJECT LOCATION

The project is located in the Westside Ranger District of the Caribou-Targhee National Forest, Caribou County, Idaho, in Section 35, Township 7 S, R 37 E. It is located approximately 52 miles South of Pocatello, ID. The project may be accessed from State Highway 30 and Forest Road 036.

SITE INFORMATION AND LIMITATIONS

The following site conditions are considered incidental to the contract and the contractor will not be paid directly for any of the following items: 1.
2.

3.

4.
5.
1.4

Option #1: Supply and install three additional horse corrals Option #2: Supply and install hitching rail.

Construction sites will be closed to the public during construction. If necessary the Forest Service will issue a closure order to the public for the horse campsites. The Contractor will be responsible for signing and limiting public access. Contractor will provide all materials and labor necessary to protect streams, wet or dry, during construction activities. The Contractor will be required to submit a stream protection plan and receive approval from the COR, in writing, prior to the beginning of construction.