Home / USCG Response Boat Small Third Generation (RB-S III) / Document

C-4 List of Deliverables

Updated

A PDF document (291 KB) attached to USCG Response Boat Small Third Generation (RB-S III), from the US Coast Guard. Due Nov 13, 2026, 2:00 PM (UTC-5).

File name: C-4 List of Deliverables_A00004.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

Department of Homeland Security (DHS)

United States Coast Guard (USCG)

Response Boat - Small Third Generation

(RB-S III)

Section C – Attachment 4

List of Deliverables

22 OCT 2026

Amendment Four (A00004)

RECORD OF CONTRACT CHANGES

Version
Orig.

Date
09/30/2026

A00004

10/22/2026

70Z02326R93250001
Purpose
Request for Proposal (RFP)
A00004 incorporates the following revisions:
1) Added the Coversheet and Record of Contract
Changes.
2) Updated the far-right column description from
“Pricing Sheet” to “Pricing Schedule / CLIN.”
3) Deliverable 14: Revised to reference 068-1.4
from 068-1.3.
4) Deliverables 23 and 24: Revised to reference
083-6 from 083-7.
5) Deliverable 40: Designated as "Reserved" to
align with SOW Section 091 being reserved.
The testing requirements for both the first boat
(demonstrator) and follow-on boats have been
consolidated and clarified within the revised
SOW Section 092.
6) Deliverables 41 & 42: Revised to reference
the updated SOW section numbers.
7) Deliverables 43 & 44: Revised to reference
the updated SOW section numbers and added
a requirement for hard-copy documentation to
be delivered with the boats.
8) Deliverable 45: Revised to require hard-copy
documentation to be delivered with the boats.
9) Deliverable 52: Revised to reference 660-1.1.6
from 660-1.1.5.
10) Deliverables 54 & 55: Added to establish
requirements for first boat acceptance testing
and documentation.

Response Boat -Small Third Generation (RB-S III)

Section C Attachment 4 List of Deliverable A00004

RB-S III

List of Deliverables
#

SOW / SPEC Ref.

Deliverable Description

Milestone

To

Required Delivery

N/A

Contract Award

KO &
COR

At Award

040-2.1.2
040-2.4

Offeror Proposal – Volume I
– Technical Proposal
including all appendices
Formal Meeting Agenda

• Post Award Conference
• Open Hull Inspection

KO &
COR

Formal meeting agenda
seven days prior to the
formal meeting

X001

• Post Award Conference
• Open Hull Inspection
• Acceptance Testing
• Post-Operational Test and Evaluation
Review.
• Follow-On Order Year Reviews
Post Award Conference

KO &
COR

Formal meeting minutes two
days after conclusion of the
formal meeting

X001

KO &
COR

X001

Starting with acceptance of second boat

KO &
COR

Monthly for the first 12
months; Quarterly thereafter,
at the end of March, June,
September, and December
• With the boat
• As needed with change(s)

The beginning of the document. Download the full file to read on.

Other documents in this bid