Home / Chino Emergency Repairs / Document

Chino Emergency Repairs

Updated

A PDF document (257 KB) attached to Chino Emergency Repairs, from the Forest Service. Due Nov 9, 2026, 1:00 PM (UTC-6).

File name: 127EAX27Q0011 Chino Emergency Repairs.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

1. SOLICITATION NO.

3. DATE ISSUED

SEALED BID (IFB)

INVITATION FOR BID

127EAX27Q0011

NEGOTIATED (RFP)

REQUEST FOR PROPOSAL

(Construction, Alteration, or Repair)

PAGE OF PAGES

10/23/2026

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror. 4. CONTRACT NO.

5. REQUISITION/PURCHASE REQUEST NO.

6. PROJECT NO.

1177775

7. ISSUED BY

CODE

8. ADDRESS OFFER TO

7EAX

USDA-FS CSA SOUTHWEST 7

333 BROADWAY BLVD SE

ALBUQUERQUE NM 87102-3498

9. FOR

INFORMATION CALL

Troy McCullough
Contracting Officer
US Forest Service
[email protected]

b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

a. NAME

TROY

MCCULLOUGH

000-000-0000

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

(Title, identifying no., date)

This project consists of providing all materials, equipment, labor, transportation, and incidentals for completion of the repair storm damage sustained on three buildings at this site.
The repairs are to include roof replacement, dry wall and insulation replacement, a door replacement, ceiling and insulation replacement, installation of gutters and downspouts, and to replace a portion of the side of the Chino Yard Office; to perform maintenance to the metal roofs on the Supervisor¿s office and the Chino Shop; to repair window frames on upper windows, to caulk ALL of windows, and to install a Z bar at the roof line on the Supervisor¿s Office; and to gutters and downspouts on the Chino Shop.
This project could also include, if additional funds are available, optional bid items. The optional bid items are exterior painting on the Yard Office; replace the weather stripping on two garage doors and a door sweep on a manway; and if mold is found in the Supervisor¿s Office to replace the dry wall and insulation.

11. The Contractor shall begin performance within
award,

x notice to proceed.

The performance period is

calendar days and complete it within
x mandatory

calendar days after receiving

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES", indicate within how many calendar days after award in Item 12b.)

x YES

NO

12b. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

1300

a. Sealed offers in original and

11/09/2026

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time . Sealed envelopes containing offers shall be

The beginning of the document. Download the full file to read on.

Other documents in this bid