Design Features
Updated
A PDF document (207 KB) attached to Corral G-Z Stewardship IRSC, Region 6, Fremont-Winema National Forest, Bly Ranger District, Bly , Oregon, from the Forest Service. Due Nov 16, 2026, 5:00 PM (UTC-8).
File name: C04_12363N26Q4181Attachment2_Design Features.pdf
The full file is for paid members, or buy this bid alone.
Preview
Bly Ranger District | July 2026
Corral G-Z IRSC Design Features
One objective of the Corral G-Z Contract is for the contractor to carry out sale preparation for future timber sales. This document provides context and outlines objectives to guide the work and ensure the project meets its intended goals. Mandatory Item 4: Project Area Implementation Plan (Grizzly) The focus of Item 4 is to refine and finalize the unit pools for commercial timber harvest as well as service units. The contractor will develop an implementation plan for the Grizzly sale. Identification of Timber Treatments
Timber treatment units will be categorized as one of the following: a) ponderosa pine
b) dry mixed conifer
c) moist mixed conifer, or
d) transmission-line treatment with timber removal.
Timber units will be treated according to the prescriptions in Attachment 4. All timber units shall be ground-verified by the Contractor prior to inclusion in the Project Area Implementation Plan. Service work shall only be included where necessary to achieve the desired results, avoiding unnecessary treatments in areas that don’t require them. Service work units shall be classified as one of the following: i)
Transmission Line Treatments (Large-tree thinning without timber removal) Transmission Line Treatment (Small-tree thinning)
ii)
iii)
Cut, Skid, and Deck – Control Features
iv)
Cut, Skid, and Deck – Timber Units
v)
Cut, Skid, and Deck – Natural Stands
vi)
Small and Large Tree Thinning – Whitebark Pine Restoration Small Tree Thinning - Old Growth
vii)
viii)
Conifer Removal – Aspen
Service work units will be ground-verified by the contractor, and a determination will be made as to whether part or all of the unit in question requires service work according to the prescriptions listed in Attachment 4. Potential service units may be expanded beyond the extent of the polygons provided by the Forest Service if deemed necessary during ground verification. If, during the reconnaissance of potential timber units, the contractor finds areas without commercial value which could nonetheless benefit from one of the treatments listed above, these shall be added as units to the service plan.
Unit Delineation
Units shall be delineated according to the following criteria: - Treatment type
- Applicable DxP Prescription. For ponderosa pine and mixed conifer units, this will be determined by the predominant plant association group (PAG) in which the timber unit is located. A shapefile
The beginning of the document. Download the full file to read on.