Home / CO BR UCPO Blue Mesa Road(1) Blue Mesa Road / Document

Draft. 01.100 Plans

Updated

A PDF document (19.5 MB) attached to CO BR UCPO Blue Mesa Road(1) Blue Mesa Road, from the Federal Highway Administration.

File name: DRAFT. 01.100 Plans (Final).pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

SHEET

PROJECT

BRASKA

NE

NG
OMI
WY

U. S.

Sterling

Steamboat

Greeley

Springs

DEPARTMENT OF THE INTERIOR

NUMBER

BUREAU OF RECLAMATION

UTAH

SHEET

SHEET

CO BR UCPO BLUE MESA ROAD(1)

NUMBER

NUMBER

BLUE MESA ROAD

DENVER

GRAND

Limon

JUNCTION

KANSAS

COLORADO

SPRINGS

Gunnison

Montrose

PLANS FOR PROPOSED

CO BR UCPO BLUE MESA ROAD(1)

Pueblo

CO BR UCPO BLUE MESA ROAD(1)

Walsenburg

BLUE MESA ROAD

Trinidad
Durango

CURECANTI NATIONAL RECREATION AREA

GUNNISON COUNTY

AHOMA

OKL

CO
XI
W ME
NE

COLORADO KEY MAP

n

Cortez

TYPE OF CONSTRUCTION:

Road reconstruction, roadway excavation, drainage improvements, roadway aggregate, asphalt concrete, and curve widening.

fo DR
rC A
F
on T
st
ru
ct
io

SCHEDULE A LENGTH 1.05 MILES

OPTION X LENGTH 0.39 MILES

OPTION Y LENGTH 0.39 MILES

END OPTION X & Y

N

176+00

DESIGN DESIGNATIONS:

ADT (2027)

ADT (2047)

DHV

T

10%

V

20 MPH

Gunnison

4.0% (100+00 - 155+50)
e(max)

U.S. CUSTOMARY DIMENSIONS:

END SCHEDULE A

Slopes are expressed as RISE:RUN

SPECIFICATIONS:

"STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND

BRIDGES ON FEDERAL HIGHWAY PROJECTS, FP-24"

c:\pw_work_cfl\dms03204\TTL(Main)BMR.dgn

BEGIN OPTION X & Y

BEGIN SCHEDULE A

155+50

100+00

Montrose

N

0.5

E
RI
CA

E
D

PLANS PREPARED BY

F TRAN

SP
TO
EN

ON
ATI
RT
O

IT
UN

ot

39 mi

DEPAR

TM

[TTL-BOR]

27 mi

2.0% (155+50 - 176+00)

AM
ST

ATES OF

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

DENVER, CO

Scale in Miles

APPROVED:

R

Chief of Engineering,
1:07 PM

25 August 2026

DATE

Central Federal Lands Highway Division

Know what'sbelow.

Call
before you dig.

PER ACCEPTANCE MEMO DATED AUGUST 18, 2026

www.call811.com

Stephanie Dyer,
Program
Bureau
of Reclamation
Curecanti Manager,
Field Division
Manager,
Bureau of Reclamation
Dan Staton

PROJECT MANAGER

HIGHWAY DESIGN MANAGER

LEAD DESIGNER

N. Mascarenas

K. Keele

M. Martinez

DATE

A1

ABBREVIATIONS

curve delta

Ø

diameter

abut.

abutment

ADT

CO BR UCPO BLUE MESA ROAD(1)

south

BLUE MESA ROAD

SADT

seasonal average daily traffic

gdr.

girder

SC

point of spiral to curve

hdwl.

headwall

sec.

section

average daily traffic

HES

homestead entry survey

shldr.

shoulder

aggr.

aggregate

hex.

hexagon

spa.

spacing, spaces or spaced

AH

ahead

horiz.

horizontal

spec.

specification

alt.

alternate

HW

high water

st.

street

appr.

approach

hwy.

highway

ST

point of spiral to tangent

asph.

asphalt

ID

inside diameter

sta.

station

both faces

incl.

inclusive, including

std.

standard

beg.

beginning, begin

int.

interior

stiff.

stiffener

BK

back

J

jt.

joint

str.

straight

BM

bench mark

L L

length of curve

struc.

structural

BP

balance point

The beginning of the document. Download the full file to read on.

Other documents in this bid