Draft 01.100 SCR
Updated
A PDF document (1.2 MB) attached to CO BR UCPO Blue Mesa Road(1) Blue Mesa Road, from the Federal Highway Administration.
File name: DRAFT 01.100 SCR (Final).pdf
The full file is for paid members, or buy this bid alone.
Preview
E-1
CO BR UCPO BLUE MESA ROAD(1)
Blue Mesa Road
SPECIAL CONTRACT REQUIREMENTS
N
ot
fo DR
rC A
on FT
st
ru
ct
io
n
The following Special Contract Requirements amend and supplement the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-24), U.S. Department of Transportation, Federal Highway Administration.
E-2
CO BR UCPO BLUE MESA ROAD(1)
Blue Mesa Road
Section 101. — TERMS, FORMAT, AND DEFINITIONS
101.02 Specifications Format. Delete the second paragraph and substitute the following: Division 150 consists of project contract requirements that apply to all contracts. The contractor must perform all work included in Division 150. Work under Division 150 is paid for directly or indirectly according to Subsection 109.05. If there is no pay item in the bid schedule, no direct payment is made.
CDR – Contractor’s Daily Record
WAPA - Western Area Power Administration
io
n
101.03(a) Acronyms. Add the following:
fo DR
rC A
on FT
st
ru
ct
101.04 Definitions. Delete the definition of (c) Supplemental agreement under Contract Modification.
101.04 Definitions. Add the following:
Masterworks — A web-based system used by the Government, Contractors, and Subcontractors on this Government contract to prepare CDRs, measurement notes (pay notes and field measurement documentation), and transmit submittals, and documents and drawings.
Section 102. — BID, AWARD, AND EXECUTION OF CONTRACT
102.02A Physical Data. (Added Subsection).
Data and information furnished or referred to below is for the Contractor's information. The Government is not responsible for any interpretation of, or conclusion drawn from the data or information by the Contractor.
ot
(a) The indications of physical conditions on the drawings and in the specifications are the result of site investigations by:
N
(1) CO BR UCPO BLUE MESA ROAD(1) Geotechnical Reconnaissance Summary, Addendum, July 1, 2026.
(2) Addendum to CO BR BLUE MESA ROAD(1) Final Hydraulic Report: Updated Culvert Lining Designs for Sta. 127+61 and Sta. 152+92, July 6, 2026.
(3) CO BR BLUE MESA ROAD(1) Pavement And Materials Report, August 2025. (b) Weather conditions: Contact the National Weather Service.
E-3
CO BR UCPO BLUE MESA ROAD(1)
Blue Mesa Road
(c) The following design data is applicable to this project and posted on https://sam.gov/: (1) Horizontal and vertical alignment listings in Portable Document Format (.pdf) and LandXML (.xml) formats;
(2) 3D surfaces of existing ground, subgrade, finished grade, and top of base
The beginning of the document. Download the full file to read on.