Home / Bradbury Dam Outlet Valve Replacement / Document

Drawings

Updated

A PDF document (19.7 MB) attached to Bradbury Dam Outlet Valve Replacement, from the Departmental Offices. Due Oct 27, 2026, 12:00 PM (UTC-7).

File name: Drawings.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

ReleaseG

D

OUTLET WORKS

BRADBURY DAM

.

CACHUMA PROJECT

C

BUREAU OF RECLAMATION

U.S. DEPARTMENT OF THE INTERIOR

¦STA TUS¦

D

B

LAST SAVED DATE

2025-12-29

LAST SAVED BY

SGARRISONTERRY

B

C

Garrison-Terry, Samuel P

DESIGNED

Garrison-Terry, Samuel P

DRAWN

Hoss, Jeff S

CHECKED

£TA£

TECH. APPR.

£AT£

£AA£

APPROVED

£TT£

ADMIN APPROVAL

SACRAMENTO, CA

A

NOTES

CAD SYSTEM

AutoCAD 25.0S (LMS TECH)

CAD FILENAME

368-208-60009-RD-1.DWG

1.
2.
3.

See Drawing No. 368-208-60011 for General Notes and
Reference Drawings.
Spillway bridge is narrow and limits access. See Specifications for full description of bridge access and dimensions.
Access road to work site continues on drawing 368-208-60010.

¦D_DT¦

ACCESS FROM HIGHWAY

154 TO SPILLWAY

GENERAL PLAN

368-208-60009

SHEET 1

A

D

E

03,

OUTLET WORKS

BRADBURY DAM

.

CACHUMA PROJECT

E

C

03,

E

1,4

,25

0N

BUREAU OF RECLAMATION

,25
03,

1,4

ALWAYS THINK

0N

C

U.S. DEPARTMENT OF THE INTERIOR

SAFETY

¦STATUS ¦

1,4

,25

0N

D

B

,25

1,4

04,

E

LAST SAVED DATE

2025-12-29

LAST SAVED BY

SGARRISONTERRY

0N

B

Garrison-Terry, Samuel P

DESIGNED

Garrison-Terry, Samuel P

DRAWN

Hoss, Jeff S

CHECKED

£AT£

£AA£

APPROVED

£TT£

£TA£

TECH. APPR.

ADMIN APPROVAL

A

1.
2.

CAD SYSTEM

AutoCAD 25.0S (LMS TECH)

CAD FILENAME

368-208-60010-RD-1.DWG

3.
4.
5.
6.

See Drawing No. 368-208-60011 for General Notes and
Reference Drawings.
Spillway bridge is narrow and limits access. See Specifications for full description of bridge access and dimensions.
Access road to work site continues on drawing 368-208-60009. All dimensions are in feet, unless shown otherwise.
Limited space available for lay down and parking at the work area. Additional space is available at Auxiliary Lay Down Areas. Government requires access to equipment near the work area throughout construction.

SACRAMENTO, CA

¦D_DT¦

NOTES

ACCESS FROM SPILLWAY A

TO OUTLET WORKS

CONTROL HOUSE

GENERAL PLAN

368-208-60010

SHEET 1

B

D

D

60"x60" openings in floor to
Valve Vault

OUTLET WORKS

BRADBURY DAM

.

ALWAYS THINK

Not to scale

CACHUMA PROJECT

OUTLET WORKS - PLAN VIEW

C

U.S. DEPARTMENT OF THE INTERIOR

B

BUREAU OF RECLAMATION

A

SAFETY

¦STATUS¦

A

C

Hoist Beam

See Note 3

HOIST BEAM

El. 593.68

See Note 4

LEGEND

TOP BACKFILL

El. 583.5

-

B
E

LAST SAVED DATE

2025-12-29

LAST SAVED BY

SGARRISONTERRY

60013

C

C

60012

60012

Concrete
Grout
Item to be Removed
Steel

B

E

60013

NOTES

1.
2.

FLOOR

El. 568.5

F

60013

D

D

60012

60012

F

60013

3.
4.
See Note 2

5.

VALVE VAULT

El. 560.0

See Specification No. 20-C0923 for additional requirements and informational drawings.
Section C-C, Section D-D, and Detail 1 pertain to removal of existing parts. Section E-E, Section F-F, and Detail 2 pertain

The beginning of the document. Download the full file to read on.

Other documents in this bid