EOTW GZ LTIRSC Appendix B
Updated
A PDF document (1.2 MB) attached to End of the World Long Term Stewardship, from the Forest Service. Due Nov 18, 2026, 9:00 AM (UTC-8).
File name: C04d_3 EOTW GZ LTIRSC Appendix B.pdf
The full file is for paid members, or buy this bid alone.
Preview
End of the World G-Z Long-Term IRSC
Nez Perce-Clearwater National Forest
Salmon River Ranger District
APPENDIX B - SCALED
STEWARDSHIP CONTRACT - TIMBER REMOVAL SPECIFICATIONS
B1.0 CONTRACT AREA
B1.1 Contract Area Map
B1.2 Claims
B2.0 TIMBER SPECIFICATIONS
B2.1 Included Timber
B2.11 Standard Timber
B2.12 Substandard Timber
B2.13 Damaged Timber
B2.131 Damaged by Contractor
B2.132 Negligent or Willful Damage
B2.134 Minor Damage by Natural Causes
B2.14 Unintentionally Cut Timber
B2.15 Construction Timber
B2.16 Other Material
B2.2 Utilization and Removal of Included Timber
B2.3 Timber Designations
B2.31 Clearcutting Units
B2.32 Construction Clearing
B2.33 Overstory Removal Units
B2.34 Understory Removal Units
B2.35 Individual Trees
B2.37 Minor Changes
B2.4 Volume Estimate
B3.0 RATES OF PAYMENT
B3.1 Current Contract Rates
B3.4 Other Payment Rates
B.341 Material Not in Division A2
B3.42 Timber Cut Through Mistake
B3.43 Designated Timber Cut But Not Removed
B3.44 Undesignated Timber Damaged Without
Negligence
B3.45 Undesignated Timber Unnecessarily Damaged
or Negligently or Willfully Cut
B3.46 Liquidated Damages
B3.47 Defect Caused by Abnormal Delay
B4.0 PAYMENTS
B4.1 Amount Payable for Timber
B4.2 Integrated Resource Account
B4.21 Cash Deposits
B4.215 Deposits When Payment Guarantee
B4.218 Cooperative Deposits
B4.24 Refund after Scaling Completed
B4.4 Payments Not Received
B5.0 TRANSPORTATION FACILITIES
B5.1 Authorization
B5.11 Requirements of Rights-of-Way
B5.12 Use of Roads by Contractor
B5.3 Road Maintenance
B5.4 Use by Others
B6.0 OPERATIONS
B6.22 Protection of Improvements
B6.221 Protection of Improvements Not Owned by Forest Service B6.222 Protection of Property
B6.23 Protection of Land Survey Monuments
B6.24 Protection Measures Needed for Plants, Animals, Cultural Resources, and Cave Resources
B6.32 Protection of Residual Trees
B6.3 Control of Operations
B6.33 Safety
B6.34 Sanitation and Servicing
B6.341 Prevention of Oil Spills
B6.342 Hazardous Substances
B6.35 Equipment Cleaning
B6.36 Acceptance of Work
B6.4 Conduct of Logging
B6.41 Felling and Bucking
B6.411 Felling in Clearings
B6.412 Stump Heights
B6.413 Bucking Lengths
B6.414 Limbing
B6.42 Skidding and Yarding
B6.421 Rigging
B6.422 Landings and Skid Trails
B6.423 Skidding on Roads
B6.424 Arches and Dozer Blades
B6.5 Streamcourse Protection
The beginning of the document. Download the full file to read on.
Other documents in this bid
- EOTW G-Z LTIRSC
- EOTW GZ IRSC Appendix A
- EOTW G-Z LTIRSC Appendix C - Jungle Bird T-Specifications
- EOTW G-Z LTIRSC Appendix D-Jungle Bird Road Plans
- FSSS Jungle Bird
- Jungle Bird Mandatory CAM
- EOTW GZ LTIRSC Overview Map
- Project Design Elements
- Layout Note Template
- Road Survey Description of Work
- End of the World Marking Guide
- Least Cost Road Standards