GENERAL NOTES

1.

ALL ELECTRICAL WORK IS NEW, AND SHALL BE INSTALLED IN ACCORDANCE WITH

THE LATEST EDITION OF THE NEC, NFPA, AND OSHA. THE CONTRACTOR SHALL

PROVIDE AND INSTALL ALL NECESSARY ELECTRICAL EQUIPMENT AND

CONNECTIONS INCLUDING CONTROL WIRING IN CONDUIT SYSTEM TO OTHER

DISCIPLINES' EQUIPMENT AS INDICATED/AS REQUIRED FOR A COMPLETE, FUNCTIONAL ELECTRICAL SYSTEM.

2.

CONDUCTORS SHALL BE COPPER MINIMUM #12 THW OR THWN, INSTALLED IN RIGID

STEEL CONDUITS FOR ABOVEGROUND AND PVC FOR UNDERGROUND RUNS.

PROVIDE 90° ELBOW AND CONDUIT TRANSITION FROM PVC TO RIGID STEEL

CONDUIT (RGS) FOR UNDERGROUND ROUTING BEFORE TURNING UP TO ABOVE

GROUND SURFACE.

3.

ALL BRANCH CIRCUITS SHALL CONTAIN WIRING INCLUDING AN INSULATED (GREEN)

GROUNDING CONDUCTOR IN A CONDUIT, EACH SIZED PER NEC. ALL CONDUCTOR

SIZES ARE BASED ON THE USE OF "THW/THWN" INSULATION.

4.

DRAWINGS ARE DIAGRAMMATIC AND DO NOT SHOW ALL OFFSETS, BENDS,

ELBOWS, JB'S, WIRE TROUGHS, PULL BOXES, HANDHOLES OR OTHER REQUIRED

ELEMENTS FOR PROPER INSTALLATION OF THE WORK. ALL NECESSARY

MATERIALS NEEDED TO FULFILL THE PROJECT REQUIREMENTS SHALL BE

PROVIDED AT NO ADDITIONAL COST.

5.

WORK SHALL BE CARRIED OUT IN COORDINATION WITH OTHER DISCIPLINES. COORDINATE WITH CIVIL CONTRACT DOCUMENTS IN TERMS OF ROUTING PATHS,

EQUIPMENT COMPATIBILITY AND MOUNTING ARRANGEMENT PRIOR TO

INSTALLATION.

A

A

H

B

6.

THE LOCATIONS OF ALL ELECTRICAL EQUIPMENT AND CONDUIT ROUTING ARE

APPROXIMATE. COORDINATE AND INSTALL THESE ITEMS SO AS TO ELIMINATE

INTERFERENCE WITH PIPING AND ALL OTHER EQUIPMENT. ADJUST THE LOCATION,

MHT's AND PROVIDE APPROPRIATE MOUNTING HARDWARE AS REQUIRED AT NO

ADDITIONAL COST.

7.

COMPLY WITH NFPAs, UFAS, OTHER APPLICABLE CODES, AND AUTHORITY HAVING

JURISDICTION OR AS SHOWN ON DRAWINGS FOR MOUNTING HEIGHTS OF ALL

ELECTRICAL EQUIPMENT AND DEVICES. MAINTAIN MINIMUM WORKING

CLEARANCES REQUIRED BY NEC AND LOCAL UTILITY COMPANY.

8.

FOLLOW MANUFACTURER'S WRITTEN INSTRUCTIONS FOR INSTALLATIONS, UNLESS

INDICATED OR SPECIFIED OTHERWISE. INFORM VA AND OBTAIN WRITTEN

DIRECTION FROM THE CONTRACTING OFFICER REPRESENTATIVE IF CONFLICTS

EXIST BETWEEN MANUFACTURERS REQUIREMENTS AND CONTRACT DOCUMENTS

PRIOR TO THE START OF THE AFFECTED WORK.

9.

ALL MATERIALS AND EQUIPMENT SHALL BE HEAVY DUTY, UL APPROVED/LISTED

AND INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S

RECOMMENDATIONS.

B

C

C

10. PROVIDE ALL GROUNDING AS PER SPECIFICATION 260526.

11. ITEMS OMITTED FROM EITHER THE SPECIFICATIONS OR THE DRAWINGS, BUT ARE

SHOWN OR DESCRIBED IN THE OTHER TRADES, AND ALL ITEMS NECESSARY TO

The beginning of the document. Download the full file to read on.