GENERAL NOTES
1.
ALL ELECTRICAL WORK IS NEW, AND SHALL BE INSTALLED IN ACCORDANCE WITH
THE LATEST EDITION OF THE NEC, NFPA, AND OSHA. THE CONTRACTOR SHALL
PROVIDE AND INSTALL ALL NECESSARY ELECTRICAL EQUIPMENT AND
CONNECTIONS INCLUDING CONTROL WIRING IN CONDUIT SYSTEM TO OTHER
DISCIPLINES' EQUIPMENT AS INDICATED/AS REQUIRED FOR A COMPLETE, FUNCTIONAL ELECTRICAL SYSTEM.
2.
CONDUCTORS SHALL BE COPPER MINIMUM #12 THW OR THWN, INSTALLED IN RIGID
STEEL CONDUITS FOR ABOVEGROUND AND PVC FOR UNDERGROUND RUNS.
PROVIDE 90° ELBOW AND CONDUIT TRANSITION FROM PVC TO RIGID STEEL
CONDUIT (RGS) FOR UNDERGROUND ROUTING BEFORE TURNING UP TO ABOVE
GROUND SURFACE.
3.
ALL BRANCH CIRCUITS SHALL CONTAIN WIRING INCLUDING AN INSULATED (GREEN)
GROUNDING CONDUCTOR IN A CONDUIT, EACH SIZED PER NEC. ALL CONDUCTOR
SIZES ARE BASED ON THE USE OF "THW/THWN" INSULATION.
4.
DRAWINGS ARE DIAGRAMMATIC AND DO NOT SHOW ALL OFFSETS, BENDS,
ELBOWS, JB'S, WIRE TROUGHS, PULL BOXES, HANDHOLES OR OTHER REQUIRED
ELEMENTS FOR PROPER INSTALLATION OF THE WORK. ALL NECESSARY
MATERIALS NEEDED TO FULFILL THE PROJECT REQUIREMENTS SHALL BE
PROVIDED AT NO ADDITIONAL COST.
5.
WORK SHALL BE CARRIED OUT IN COORDINATION WITH OTHER DISCIPLINES. COORDINATE WITH CIVIL CONTRACT DOCUMENTS IN TERMS OF ROUTING PATHS,
EQUIPMENT COMPATIBILITY AND MOUNTING ARRANGEMENT PRIOR TO
INSTALLATION.
A
A
H
B
6.
THE LOCATIONS OF ALL ELECTRICAL EQUIPMENT AND CONDUIT ROUTING ARE
APPROXIMATE. COORDINATE AND INSTALL THESE ITEMS SO AS TO ELIMINATE
INTERFERENCE WITH PIPING AND ALL OTHER EQUIPMENT. ADJUST THE LOCATION,
MHT's AND PROVIDE APPROPRIATE MOUNTING HARDWARE AS REQUIRED AT NO
ADDITIONAL COST.
7.
COMPLY WITH NFPAs, UFAS, OTHER APPLICABLE CODES, AND AUTHORITY HAVING
JURISDICTION OR AS SHOWN ON DRAWINGS FOR MOUNTING HEIGHTS OF ALL
ELECTRICAL EQUIPMENT AND DEVICES. MAINTAIN MINIMUM WORKING
CLEARANCES REQUIRED BY NEC AND LOCAL UTILITY COMPANY.
8.
FOLLOW MANUFACTURER'S WRITTEN INSTRUCTIONS FOR INSTALLATIONS, UNLESS
INDICATED OR SPECIFIED OTHERWISE. INFORM VA AND OBTAIN WRITTEN
DIRECTION FROM THE CONTRACTING OFFICER REPRESENTATIVE IF CONFLICTS
EXIST BETWEEN MANUFACTURERS REQUIREMENTS AND CONTRACT DOCUMENTS
PRIOR TO THE START OF THE AFFECTED WORK.
9.
ALL MATERIALS AND EQUIPMENT SHALL BE HEAVY DUTY, UL APPROVED/LISTED
AND INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S
RECOMMENDATIONS.
B
C
C
10. PROVIDE ALL GROUNDING AS PER SPECIFICATION 260526.
11. ITEMS OMITTED FROM EITHER THE SPECIFICATIONS OR THE DRAWINGS, BUT ARE
SHOWN OR DESCRIBED IN THE OTHER TRADES, AND ALL ITEMS NECESSARY TO
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Bid document
- Attachment 11: Fort Sill NC Plan Set Reduced 9 of 11
- Attachment 12: Fort Sill NC Plan Set Reduced 10 of 11
- Attachment 1: Fort Sill NC Invitation for Bids Statement of Work
- Attachment 2: Fort Sill NC Combined Specifications
- Attachment 3: Fort Sill NC Plan Set Reduced 1 of 11
- Attachment 6: Fort Sill NC Plan Set Reduced 4 of 11
- Attachment 7: Fort Sill NC Plan Set Reduced 5 of 11
- Attachment 9: Fort Sill NC Plan Set Reduced 7 of 11
- Prebid Request for Information Fort Sill Gravesite Expansion and FCA
- Bid document
- Fort Sill NC Plan Set Reduced Amendment 1 of 11