Home / Flight Test, Telemetry and Termination (FT3) Flight Test… / Document

FT3 Performance Work Statement Production Follow-On 1 Jun 26v1

Updated

A Word document (103 KB) attached to Flight Test, Telemetry and Termination (FT3) Flight Test Kit Production, from the Department of the Air Force. Due Feb 18, 2027, 5:00 PM (UTC-7).

File name: 1. FT3 PWS_Production Follow-On_1 Jun 26v1.docx

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

PERFORMANCE WORK STATEMENT

for

FLIGHT TEST, TELEMETRY, AND TERMINATION (FT3) PROGRAM

OPERATIONS AND SUPPORT PHASE

FT3 Production Follow-On
Date

AIR FORCE NUCLEAR WEAPONS CENTER (AFNWC)

INTERCONTINENTAL BALLISTIC MISSILE (ICBMSD)

SYSTEMS DIRECTORATE (AFNWC/NI)

MMIII Systems Program Office (AFNWC/NIM)
Guidance Branch (AFNWC/NIMG)
Hill Air Force Base, Utah
162560441960Distribution Statement A:
Distribution authorized to Department of War and U.S. DoD contractors only (public release), 8 April 26. Other requests must be referred to MMIII SPO (AFNWC/NIM), 6014 Dogwood Ave, Hill AFB UT 84056. 020000Distribution Statement A:
Distribution authorized to Department of War and U.S. DoD contractors only (public release), 8 April 26. Other requests must be referred to MMIII SPO (AFNWC/NIM), 6014 Dogwood Ave, Hill AFB UT 84056.

TOC \o "1-3" \u 1SECTION I. DESCRIPTION OF SERVICES/SCOPE PAGEREF _Toc225946979 \h 3 1.1Introduction PAGEREF _Toc225946980 \h 3
1.2Description of Services PAGEREF _Toc225946981 \h 3
1.3Scope and Period of Performance PAGEREF _Toc225946982 \h 3 2SECTION II. Production Description of Tasks PAGEREF _Toc225946983 \h 3 2.1Flight Test Kit Production PAGEREF _Toc225946984 \h 3 2.1.1Program Objectives PAGEREF _Toc225946985 \h 3
2.1.2Contract Objectives PAGEREF _Toc225946986 \h 4
2.1.3Aerospace Vehicle Equipment Integration, Assembly, Test and Checkout PAGEREF _Toc225946987 \h 4 2.1.4Parts Management Working Group and Parts, Materials, and Processes (PMP) Management Plan PAGEREF _Toc225946988 \h 6 2.1.5Production Readiness Review and Audits PAGEREF _Toc225946989 \h 7 2.1.6Manufacturing Practices and Materiel Fielding PAGEREF _Toc225946990 \h 7 2.1.7Packaging, Handling, Storage and Transportation (PHS&T) PAGEREF _Toc225946991 \h 9 2.1.8Program Management PAGEREF _Toc225946992 \h 9
3SECTION III. General Requirements PAGEREF _Toc225946993 \h 12 3.1Contractor Travel PAGEREF _Toc225946994 \h 12
3.2Scientific Technical Information (STINFO) and Controlled Unclassified Information (CUI) PAGEREF _Toc225946995 \h 12 3.3Applicable Documents PAGEREF _Toc225946996 \h 13
3.4Base or Area Badges for Access to Government Facilities PAGEREF _Toc225946997 \h 13 3.5Common Access Card (CAC) PAGEREF _Toc225946998 \h 13 3.6Continuation of Mission-Essential Services During a Crisis PAGEREF _Toc225946999 \h 14 3.7Mission-Essential Contractor Services Plan PAGEREF _Toc225947000 \h 14 3.8Days and Hours of Operation PAGEREF _Toc225947001 \h 14

The beginning of the document. Download the full file to read on.

Other documents in this bid