Home / Flight Test, Telemetry and Termination (FT3) Flight Test… / Document

FT3 Production Follow-On Contract Data Requirements List Package

Updated

A Word document (258 KB) attached to Flight Test, Telemetry and Termination (FT3) Flight Test Kit Production, from the Department of the Air Force. Due Feb 18, 2027, 5:00 PM (UTC-7).

File name: 3. FT3 Production Follow-On CDRL Package 24 Apr 2026.docx

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

Contract Data Requirements List (CDRL)
Program: FT3 Production Follow-On
Date: 24 April 2026
Version: 1
Date of Determination: (Contract Award Date unless otherwise specified on the CDRL)

1. Introduction

This document was developed in accordance with DOD MIL-STD 31000C and DODM 5010.12 Acquisition and Management of Contractor-Prepared Data. This represents the general requirements for the Technical Data Package (TDP) for this program. The purpose of this Attachment, Technical Data Package, is to define the data deliverables due for this program, including the instructions for their development, and delivery. All specific delivery instructions are specified on the CDRL forms or its digital (word, excel, pdf) equivalent.

2. General Guidelines

The CDRL form, Department of Defense (DD) Form 1423, specifies the data required to be delivered to the Government, as well as the frequency and approval requirements. The Data Item Descriptions (DIDs), listed on the CDRL form, were selected from the Acquisition Streamlining and Standardization Information System (ASSIST) and provide additional direction for data preparation.

3. Communications

Any correspondence related to requests for data delivery deviations and/or amendments, additions or deletions to the CDRL form shall be addressed to the Procuring Contracting Officer (PCO) with a courtesy copy to the Data Management Officer (DMO) (Air Force Nuclear Weapons Center (AFNWC)/NIMED) and the cognizant Program Manager (PM). Copies of all forms and templates noted in this file are available as requested from PM, DMO, or PCO.

4. Codes used in the DD Form 1423
All CDRLs require Government approval. The directions for submittal and approval of data are indicated in Blocks 7, 8, 9, 10, 11, 12, 13, 14, 15, and 16 of the DD Form 1423. Usually, the direction is in the form of a code (explained below). The following abbreviations/codes are common usage within AFNWC.

4.1 Block 7, DD Form 250 Requirements
Block 7 of the CDRL form indicates whether Procurement Quality Assurance (PQA) inspections and acceptance of deliverable data by DD Form 250 is required. “Draft” copies submitted for advance approval and “Preliminary Draft” copies submitted are exempt from the DD Form 250 requirements. Information copies of DD Form 250 to accompany each letter of transmittal for this category of data.

Code
Inspection
Acceptance
SS
Source (DD Form 250 or equivalent document)
Source (DD Form 250 or equivalent document)
DD
Destination (DD Form 250 or equivalent document)

The beginning of the document. Download the full file to read on.

Other documents in this bid