Flight Test, Telemetry, and Termination (FT3): Production and Sustainment Government Rights in Data (GRID)
01905000

1. Introduction

(a) Purpose of this Attachment

The purpose of this Attachment on Government Rights in Data (GRID) is to identify specifically the rights the Government will acquire to all FT3 Production Follow-On efforts to include production data, computer software and computer software documentation delivered or otherwise provided to the Government during performance of this contract. Section 2 defines the scope and applicability of the provisions of this Attachment; Section 3 contains definitions; Section 4 identifies the rights the U.S. Government will acquire regarding classes of technical data, software, and software documentation as provided for in the Defense Federal Acquisition Regulation Supplement (DFARS) and additionally as provided for by the Contractor. Appendix A lists Commercial Software Licenses which contains the complete text of commercial licenses for each product identified in Section 4 (if applicable). Appendix B contains a list of Technical Data Previously Delivered to the Government in accordance with DFARS Clause 252.227-7028. Appendix C includes a table from DFARS Clause 252.227-7992 Identification and Assertion of Use, Release, or Disclosure Restrictions.

(b) Minimum Required Rights
The purpose of this contract is to produce flight test kit replenishment spares necessary to support the AFGSC Force Development Evaluation Operational Test Launch (OTL) mission. The OTLs are critical to validating the continued accuracy and reliability of the MMIII Intercontinental Ballistic Missile (ICBM) Weapon System, and providing data to ensure a safe, secure, and effective nuclear deterrent. It is necessary to produce flight test kit replenishment spares and sustain FT3 systems to support MMIII OTL Program through 2040 or until the AFGSC establishes a termination date for MMIII OTLs. Continued production is mandated by Federal law (10 U.S.C. 2281, 42 U.S.C. 14712). Accordingly, the Government has determined the following are the minimum rights:

Unlimited Rights to all noncommercial technical data listed in Table 1. where the phrase “Unlimited” is stated in column 4 of the row associated with that item of technical data; Government Purpose Rights to all remaining noncommercial technical data and computer software listed in Table 1. where the phrase “Contractor to Complete” is stated in column 3 of the row associated with that item of technical data or computer software and contract clauses H001, H002, H003, H004 and H005 of the proposed contract;