Home / 658-23-108 Correct Stormwater Drainage / Document

Item 55 - Suggested Soil Boring Location to Bidders

Updated

A PDF document (4.9 MB) attached to 658-23-108 Correct Stormwater Drainage, from the Department of Veterans Affairs. Due Nov 10, 2026, 5:00 PM (UTC-5).

File name: Item 55 - Suggested Soil Boring Location to Bidders.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

SEE SHEET CU102

A
D

D

X

A

X
X

X

X
X

EX. FENCE

X

X

X
1055

X

6" CI

CB-115

X

C
D

E

~

~

~

4+0

+0

W

~

~
E

C E

~

E

D
C
E

C
E

EX. SIGN

SEAL OPENING AROUND PIPE INSIDE MANHOLE

4.

FURNISH AND INSTALL NEW LADDER RUNGS. SEE SHEET CK503, DETAIL C4

5.

RE-ESTABLISH BACKDROP MANHOLE CONNECTION IF DISTURBED DURING WORK

6.

PERFORM PIPE LINING AND REPAIR

7.

FURNISH AND INSTALL CATCH BASIN & COVER. SEE SHEET CK501, DETAILS D6, E8, F3 & F8

8.

PATCH & MORTAR TOP BRICK LAYER OF STRUCTURE

9.

PUMP OUT WATER FROM FLOODED CATCH BASIN INLET. CONTRACTOR TO FURTHER INVESTIGATE INLET AND OUTLET

CONNECTIONS TO DETERMINE FLOOD ISSUE WITHIN INLET STRUCTURE

FURNISH AND INSTALL HDPE PIPING

12.

FURNISH AND INSTALL MANHOLE & COVER. SEE SHEET CK503, DETAIL C1 AND SHEET CK502, DETAIL F9

E
FURNISH AND INSTALL CATCH BASIN GRATE. SEE SHEET CK501, DETAILS D6 & F8.

REMOVE INTRUDING ROOT IN PIPE

EX.TWS

8+00
D

SEE SHEET CU106

EX.FH

EX.TWS

E

E

EX.
E

W

FURNISH AND INSTALL CURB INLET & COVER. SEE SHEET CK503, DETAIL E3

17.

FURNISH AND INSTALL RCP PIPING

18.

FURNISH AND INSTALL OUTLET CONTROL STRUCTURE. SEE SHEET CK501, DETAIL D4 FOR INFILTRATION POND OCS AND

SHEET CK502, DETAIL C6 FOR SUBSURFACE INFILTRATION CHAMBER OCS

19.

FURNISH AND INSTALL FLARED END SECTION. SEE SHEET CK502, DETAIL C1

20.

FURNISH AND INSTALL RIP RAP. SEE SHEET CK501, DETAIL C1

21.

FURNISH AND INSTALL TRENCH DRAIN. SEE SHEET CK504, DETAIL C6

22.

FURNISH AND INSTALL CATCH BASIN HOOD. SEE SHEET CK501, DETAIL F1

23.

FURNISH AND INSTALL NEW HEADWALL. SEE SHEET CK502, DETAIL E1

E EX. DECID. 24"

24.

EX. LP

25.

EX. BENCH

W
W

D

E

GAS

JET OUT AND VACUUM DEBRIS TO REMOVE BLOCKAGE

RELOCATE EXISTING LIGHT POLE

F

FURNISH AND INSTALL NEW ELECTRICAL SERVICE. MATCH IN KIND

26.

FURNISH AND INSTALL NEW DI WATER SERVICE. MATCH SIZE IN KIND. SEE SHEET CK505, DETAILS B1, B4, B7, C1 & C4

27.

FURNISH AND INSTALL NEW SEWER SERVICE

W

SCALE: 1" = 50'

Consultant

Architect/Engineer of Record

Stamp

Mabbett
Scientists I Engineers I Program Managers

Mabbett & Associates, Inc.
105 Central Street Stoneham, MA 02180-1248

T. 781-275-6050

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

#

Revisions

VA FORM 08 - 6231

Date

Drawing Title

Phase

Approved:

Project Title

Sprinkler Status

Location
1970 Roanoke Boulevard Salem, VA 24153-6404
Issue Date
01.28.2026

Project Number
658-23-108

Correct Storm Water Drainage

100% FINAL DESIGN

DRAINAGE PLAN

U.S. Department
of Veterans Affairs

www.mabbett.com

D

FURNISH AND INSTALL PVC PIPING. SEE NOTE 5

11.

E

EX.

EMERG. BOX

W/ BOLLARDS

C
E

S

GA

"

/4
DY
GAS

CB-13

LOT Z

The beginning of the document. Download the full file to read on.

Other documents in this bid