Item 55 - Suggested Soil Boring Location to Bidders
Updated
A PDF document (4.9 MB) attached to 658-23-108 Correct Stormwater Drainage, from the Department of Veterans Affairs. Due Nov 10, 2026, 5:00 PM (UTC-5).
File name: Item 55 - Suggested Soil Boring Location to Bidders.pdf
The full file is for paid members, or buy this bid alone.
Preview
SEE SHEET CU102
A
D
D
X
A
X
X
X
X
X
EX. FENCE
X
X
X
1055
X
6" CI
CB-115
X
C
D
E
~
~
~
4+0
+0
W
~
~
E
C E
~
E
D
C
E
C
E
EX. SIGN
SEAL OPENING AROUND PIPE INSIDE MANHOLE
4.
FURNISH AND INSTALL NEW LADDER RUNGS. SEE SHEET CK503, DETAIL C4
5.
RE-ESTABLISH BACKDROP MANHOLE CONNECTION IF DISTURBED DURING WORK
6.
PERFORM PIPE LINING AND REPAIR
7.
FURNISH AND INSTALL CATCH BASIN & COVER. SEE SHEET CK501, DETAILS D6, E8, F3 & F8
8.
PATCH & MORTAR TOP BRICK LAYER OF STRUCTURE
9.
PUMP OUT WATER FROM FLOODED CATCH BASIN INLET. CONTRACTOR TO FURTHER INVESTIGATE INLET AND OUTLET
CONNECTIONS TO DETERMINE FLOOD ISSUE WITHIN INLET STRUCTURE
FURNISH AND INSTALL HDPE PIPING
12.
FURNISH AND INSTALL MANHOLE & COVER. SEE SHEET CK503, DETAIL C1 AND SHEET CK502, DETAIL F9
E
FURNISH AND INSTALL CATCH BASIN GRATE. SEE SHEET CK501, DETAILS D6 & F8.
REMOVE INTRUDING ROOT IN PIPE
EX.TWS
8+00
D
SEE SHEET CU106
EX.FH
EX.TWS
E
E
EX.
E
W
FURNISH AND INSTALL CURB INLET & COVER. SEE SHEET CK503, DETAIL E3
17.
FURNISH AND INSTALL RCP PIPING
18.
FURNISH AND INSTALL OUTLET CONTROL STRUCTURE. SEE SHEET CK501, DETAIL D4 FOR INFILTRATION POND OCS AND
SHEET CK502, DETAIL C6 FOR SUBSURFACE INFILTRATION CHAMBER OCS
19.
FURNISH AND INSTALL FLARED END SECTION. SEE SHEET CK502, DETAIL C1
20.
FURNISH AND INSTALL RIP RAP. SEE SHEET CK501, DETAIL C1
21.
FURNISH AND INSTALL TRENCH DRAIN. SEE SHEET CK504, DETAIL C6
22.
FURNISH AND INSTALL CATCH BASIN HOOD. SEE SHEET CK501, DETAIL F1
23.
FURNISH AND INSTALL NEW HEADWALL. SEE SHEET CK502, DETAIL E1
E EX. DECID. 24"
24.
EX. LP
25.
EX. BENCH
W
W
D
E
GAS
JET OUT AND VACUUM DEBRIS TO REMOVE BLOCKAGE
RELOCATE EXISTING LIGHT POLE
F
FURNISH AND INSTALL NEW ELECTRICAL SERVICE. MATCH IN KIND
26.
FURNISH AND INSTALL NEW DI WATER SERVICE. MATCH SIZE IN KIND. SEE SHEET CK505, DETAILS B1, B4, B7, C1 & C4
27.
FURNISH AND INSTALL NEW SEWER SERVICE
W
SCALE: 1" = 50'
Consultant
Architect/Engineer of Record
Stamp
Mabbett
Scientists I Engineers I Program Managers
Mabbett & Associates, Inc.
105 Central Street Stoneham, MA 02180-1248
T. 781-275-6050
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
#
Revisions
VA FORM 08 - 6231
Date
Drawing Title
Phase
Approved:
Project Title
Sprinkler Status
Location
1970 Roanoke Boulevard Salem, VA 24153-6404
Issue Date
01.28.2026
Project Number
658-23-108
Correct Storm Water Drainage
100% FINAL DESIGN
DRAINAGE PLAN
U.S. Department
of Veterans Affairs
www.mabbett.com
D
FURNISH AND INSTALL PVC PIPING. SEE NOTE 5
11.
E
EX.
EMERG. BOX
W/ BOLLARDS
C
E
S
GA
"
/4
DY
GAS
CB-13
LOT Z
The beginning of the document. Download the full file to read on.