DEPARTMENT OF THE NAVY
NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND FAR EAST
PSC 473 BOX 13
FPO AP 96349
Notice No. 2
28 Oct 2026
RFP N40084-26-R-1026
CUSTODIAL, PEST CONTROL, AND GROUNDS MAINTENANCE AND LANDSCAPING (CPG)
AT
U.S. MARINE CORPS AIR STATION (MCAS) IWAKUNI, JAPAN
NOTE: The following schedule is provided for INFORMATION ONLY. The RFP remains unchanged unless it is amended in writing on a Standard Form 30.
Request for Information Questions and Responses
5.
Reference: PWS Spec item 3.3, pg. 736
Storm Drainage Systems: Is the contractor required to perform maintenance activities within the flight line restricted area?
ANSWER: No. Maintenance activities within the flight line restricted area are not included in the scope of this contract. Airfield areas are excluded from Attachment J-1503050-20, Storm Drainage Maps.
6.
Reference: PWS Spec item 3.3, pg. 736
Storm Drainage Systems: If maintenance within the flight line restrited area is required, may these activities be performed during daytime hours?
ANSWER: Maintenance within the flight line restricted area is not required in accordance with the PWS and Attachment J-1503050-20, Storm Drainage Maps. 7.
Reference: PWS Spec item 3.3, pg. 736
Please provide pictures of the existing drainage systems, if available, or provide opportunity to survey this area.
ANSWER: Photographs will not be provided. The pre-proposal site visit has concluded and no additional site visits will be scheduled. Offerors shall base their proposals on the PWS requirements and Attachment J-1503050-20, Storm Drainage Maps. 8.
Reference: Section L7. Proposal Currency pg 48.
Please provide the current operating procedures for storm drainage system maintenance.
N4008426R1026
ANSWER: The Government does not provide operating procedures. This is a performance-based service acquisition; offerors are solely responsible for determining their own operational methods, staffing, and technical approach to fulfill the requirements established in the PWS. 9: Reference: PWS Spec item 3.3, pg. 736
Please identify the exact locations o SGCZONEs 1 through 9 referenced in Section 3.4, "Storm Drainage Systems Cleaning Schedule," of Attachment J-1503050-10 (Pages 882-888). ANSWER: SGCZONE designations reflect the incumbent contractor's internal methodology and were provided for historical informational reference only. Offerors are not required to adopt this zoning and shall establish their own schedules and operational approach in accordance with the
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Encl 10 MCASO 5500.2W Appendix
- Encl 11 MCASO 5500.2W MCAS Iwakuni Access Control
- Encl 3 Safety
- Encl 4 Experience Data Sheet
- Encl 5 Past Performance Questionnaire with Japanese Translation
- Encl 7 APPENDIX A-INDIVIDUAL ACKNOWLEDGEMENT AND MEMORANDUM OF UNDERSTANDING FOR COMPLIANCE WITH MCASO
- Encl 8 APPENDIX A-JN-INDIVIDUAL ACKNOWLEDGEMENT AND MEMORANDUM OF UNDERSTANDING FOR COMPLIANCE WITH MCASO
- Encl 9 MCASO 3070.2B
- Solicitation
- Encl 4 Experience Data Sheet Amendment 1
- Amendment 0001
- Request for Information Questions and Responses