Jessamine Camp Nelson Heavy
Updated
A PDF document (56 KB) attached to Camp Nelson National Cemetery, KY 833CM3030 – Correct FCA Deficiencies, from the Department of Veterans Affairs. Due Nov 13, 2026, 9:00 AM (UTC-5).
File name: P07 Jessamine Camp Nelson Heavy.pdf
The full file is for paid members, or buy this bid alone.
Preview
4/14/26, 8:25 AM
SAM.gov
"General Decision Number: KY20260082 01/02/2026
Superseded General Decision Number: KY20250082
State: Kentucky
Construction Type: Heavy
Counties: Bourbon, Clark, Fayette, Jessamine, Scott and Woodford Counties in Kentucky.
HEAVY CONSTRUCTION PROJECTS (including sewer/water
construction).
Modification Number
Publication Date
01/02/2026
ELEC0369-004 09/04/2024
Rates
Fringes
LINE CONSTRUCTION
26%+7.40
26%+7.40
26%+7.40
---------------------------------------------------------------ELEC0369-008 05/27/2025 Rates
Fringes
22.44
---------------------------------------------------------------ENGI0181-016 07/01/2025 Rates
Fringes
POWER EQUIPMENT OPERATOR
19.60
OPERATING ENGINEER CLASSIFICATIONS
GROUP 1 - Crane; Forklift
Operators on cranes with boom 150 feet and over, including jib, shall receive $0.75 above Group 1. All cranes with piling leads will receive $0.50 above Group 1 rate
regardless of boom length. Combination rate shall mean
$0.50 per hour above the basic hourly rate of pay.
Employees assigned to work below ground level are to be paid 10% above basic wage rate. This does not apply to open cut work.
---------------------------------------------------------------ENGI0181-051 07/01/2025 Rates
Fringes
POWER EQUIPMENT OPERATOR
19.60
19.60
19.60
https://sam.gov/wage-determination/KY20260082/0
4/14/26, 8:25 AM
SAM.gov
OPERATING ENGINEER CLASSIFICATIONS
GROUP 1 - Drill; Pumpcrete; Roller (Bituminous)
GROUP 2 - Bobcat/Skid Steer/Skid Loader; Concrete Pump; Roller (Rock)
GROUP 4 - Pump; Roller (Earth)
Operators on cranes with booms 150 feet and over (including jib) shall receive $1.00 above Group 1 rate; 250 feet and over including jib shall receive $1.50 above Class 1 rate. Combination Rate: All crane operators operating cranes, where the length of the boom in combination with the length of the piling leads equal or exceeds 150 feet, shall
receive $1.00 above the Group 1 rate.
Employees assigned to work below ground level are to be paid 10% above basic wage rate. This does not apply to open cut work.
---------------------------------------------------------------IRON0044-005 06/01/2025 Rates
Fringes
IRONWORKER (STRUCTURAL AND
23.90
---------------------------------------------------------------IRON0070-011 06/01/2025 Rates
Fringes
25.80
---------------------------------------------------------------LABO0189-020 07/01/2025 Rates
Fringes
LABORER
19.66
---------------------------------------------------------------LABO0265-014 05/01/2024
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Jessamine Camp Nelson Building
- Jessamine Camp Nelson Highway
- Camp Nelson Sol draft
- Attachment - DOL Payroll Form
- Attachment - Past Performance Questionnaire
- Attachment - Project Sample Template
- Price Proposal Breakdown
- Amendment 1
- Liquidated Damages CNNC FCA Corrections CONS
- Amendment 2
- From CNNC FCA Corrections CONS BD DRAWINGS VOL 1 addendum01
- Amendement 0002