COLBY COMPANY ENGINEERING, LLC

47A York St
Portland, Maine
04101 USA
colbycoengineering.com

October 29, 2026
DESIGN-BID-BUILD P084: Next Generation Torpedo Integration Lab Naval Station Newport, Newport, RI – Addendum 006
P-084 Specifications Notes Regarding Additions/Deletions in Addendum 006: 00 01 05 New Sheet Index with additional sheets added per the steam bid alternate. 01 30 00 Administrative Requirements Section 1.9.1 has been revised to “45 calendar days” after award, for consistency with section 1.9.
01 33 00 Submittal Procedures Section 1.11 has been revised to "20 working days" for Contracting Officer review for consistency with the rest of the specification. 01 33 29 Sustainability Requirements and Reporting Specification attachment NAVFAC High Performance and Sustainable Building Checklist Project “Design Level” has been updated to “100%”. 02 41 00 Demolition and Deconstruction Specification has an added attachment, Building 1371 AUV Addition drawings containing existing stormwater dry swale design information, all pertinent information regarding this system is clouded.
02 82 00 Added Section 1.1 Hazardous Materials Summary Report which notes the hazardous material for the steam bid alternate. Also edited 1.4.1 Description of Work to note the hazardous materials associated with the steam bid alternate.
23 07 00 Edited to qualify piping insulation thicknesses and types.

23 22 26.00 20 Specification

28 10 05 Spec Section added.
32 31 13.53 Section 2.2.1.2 has been revised to indicate 15-guage wire. 32 31 13.53 Section 3.2.8 has been revised to include the grounding requirements. 33 63 13 Edited section 1.3.4 Steam piping design conditions for distribution piping have been updated to 150 psig at 500°F. Edited Section 1.3.5 Condensate piping design conditions for distribution piping have been updated to 150 psig at 250°F. Drawings:
Items listed below document drawing edits made after the Final Design Submission to the current Addendum 006 Submission.
Items listed are related to scope of project; general edits that do not have scope or cost implications are not documented.

P084
Naval Station Newport, Newport, RI

October 29, 2026

COLBY COMPANY ENGINEERING, LLC

47A York St
Portland, Maine
04101 USA
colbycoengineering.com

P-084 Drawings Notes Regarding Additions/Deletions in Addendum 006:

On NAVFAC Dwg. No. 12946136 G-002 DRAWING INDEX 1

Drawing Index Updates
Sheet CJ-110 added.
Sheet CD-110 added.
Sheet C-110 added.