P1550 PPI RESPONSES 2
Updated
A PDF document (185 KB) attached to Design-Bid-Build (DBB) SOF Marine Raider Facilities Complex, Marine Corps Base (MCB) Camp Lejeune, North Carolina, from the Department of the Navy. Due Oct 27, 2026, 2:00 PM (UTC-4).
File name: P1550 PPI RESPONSES 2.pdf
The full file is for paid members, or buy this bid alone.
Preview
Date
Submitted
Reference
Page
Section
Paragraph
Question
Response
5/29/2026
Sec on 01 14 00
Work Restric ons
1.2
Sec on 01 14 00 Work Restric ons, Part 1.2 states, "The Contractor shall comply with all special scheduling requirements as described in the a ached project descrip on and as noted on the drawings." The referenced special scheduling requirements are not found in the project descrip on in SECTION 01 11 00 of the RFP. Please clarify the loca on and/or if these requirements are forthcoming?
Submit proposals in accordance with RFP,
Specifica ons, Drawings and all amendments.
5/29/2026
Amendment 0001
4.1 Site Visit
Please check SAM.gov for a achment
Amendment 0001
4.1 Site Visit
The informa on regarding the site visit provided in Amendment 0001 states: 1. "Everyone is required to submit their name on the a ached spreadsheet for MARSOC." and 2. "Those wishing to a end the site visit must submit the base access and MARSOC spreadsheets no later than June 8, 2026, by 2:00 PM EDT to Ashley Ruiz at [email protected]." Please provide the necessary spreadsheet for submi ng the names of site visit a endees. A site visit is scheduled for Thursday, June 11th, and bidder inquiries are due on Monday, June 15th, which is two (2) business days a er the site visit, as outlined in the solicita on requirements. Would the Government consider extending the inquiry due date? An extension would provide adequate me a er the site visit for bidders to submit ques ons, thereby reducing project risks for both the Government and the Offerors, and improving the Offerors' ability to submit accurate and compe ve pricing. The cable schedule on ES504 references detail B4 on Drawings ES502. The sable schedule indicates new conduit size as 6", Detail B4 is indica ng a conduit size of 5 ". please confirm which conduit size is correct.
ES101 calls for the demoli on of JB2 and installa on of the new switch board 1. JB2 is currently connect down stream to JB3 that is not in contract. please confirm any restric ons to replacing JB2 with SW 1 as it impacts JB3.
5/29/2026
Site Drawings
ES504 & ES502
Site Drawings
ES101 & ES504
Site Drawings
TS104, TS 105
Site Drawings
TS107
Building A3
E-105 and E-106
Building A2
FA105
Civil
Drawings
Detail A2
The Government is no ng these inquiries and may
decide accordingly.
Provide 6" conduit per schedule.
Down me must be specifically coordinated with
contrac ng officer to minimize interrup on for ac vity.
on drawing TS104 plan note 2 adds six 5" conduits to the exis ng duct bank. plan note 4
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Attachment B - PIEE Vendor Access Instructions
- Attachment C - Price Proposal Form
- Attachment D - Construction and Design Experience Project Data Sheet
- Attachment E - Past Performance Questionnaire
- Attachment F - Historical Small Business Utilization
- Attachment G - SPCD
- Attachment H -Small Business Subcontracting Plan
- Solicitation
- Amendment 1
- Attachment C - Price Proposal Form Revised
- Attachment I - DOD-CUI Non-Disclosure Agreement
- P1550 PPI RESPONSES 1