P1550 PPI RESPONSES 3

Updated

A PDF document (395 KB) attached to Design-Bid-Build (DBB) SOF Marine Raider Facilities Complex, Marine Corps Base (MCB) Camp Lejeune, North Carolina, from the Department of the Navy. Due Oct 27, 2026, 2:00 PM (UTC-4).

File name: P1550 PPI RESPONSES 3.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

Date
Submitted

Section

6/12/2026

Reference
Page
Solicitation

6/15/2026

Specifications

01 45 00

6/16/2026

Solicitation (RFP)
& Amend 1

6/16/2026

N/A

6/16/2026

01 14 00

Question

Response

Solicitation does not include the Liquidated Damages daily rate as it notes this will be provided via forthcoming Amendment. Rate was not provided with Amendment 1. Please provide Liquidated Damages daily rate.

$12,750.08/day

1.7 QUALITY CONTROL (QC) SPECIALISTS

Provide a separate QC Specialist at the work site for each of the areas as listed in the Matrix listed below, who must assist and report to the QC Manager and who must have no duties other than their assigned quality control duties. These individuals or specialized technical companies are directly employed by the Prime Contractor and cannot be employed by a supplier or subcontractor on this project. Please consider that these QC specialist be employed by subcontractors and not the Prime Contractor.
Phasing; is there a desired phasing for this project that we can portray in our solicitation schedule?

Provide the QC specialists as
required by the matrix and
employed by the Prime

Will the government accept partial BOD on individual buildings or are all four projects required to be turned over at the same time at the end of construction.

No desired phasing specified.

The installation access is heavily geared toward typical DBIDS processes. There is no additional instructions for special MARSOC access and those protocols. Please provide the pass/tag requirements for secondary MARSOC access.

1. Stone Bay Access (Outer

Perimeter): Access to Stone
Bay requires a valid Common
Access Card (CAC) or a Defense
Biometric Identification System
(DBIDS) / Business Access
Identification Badge obtained
in accordance with Section 01
14 00, Paragraph 1.3.1.2.

Paragraph

1.3.1.2

No desired phasing specified.

2. MARSOC Compound Access

(Inner Perimeter): Entry
requires secondary security
processing, where prime
contractors must submit the

6/16/2026

General

6/16/2026

01 14 00

Are there any known PFAS conditions that the contractor needs to consider to comply with to achieve this work?

1.5

Are there any known UXO conditions that the contractor needs to consider to comply with to achieve this work?

names of their employees and
subcontractors using the
attached MARSOC access
roster (excel spreadsheet) to
the NAVFAC Construction
Manager, who then forwards
the information to the
MARSOC Security Office.
Contractors may update the