P1550 PPI RESPONSES 3
Updated
A PDF document (395 KB) attached to Design-Bid-Build (DBB) SOF Marine Raider Facilities Complex, Marine Corps Base (MCB) Camp Lejeune, North Carolina, from the Department of the Navy. Due Oct 27, 2026, 2:00 PM (UTC-4).
File name: P1550 PPI RESPONSES 3.pdf
The full file is for paid members, or buy this bid alone.
Preview
Date
Submitted
Section
6/12/2026
Reference
Page
Solicitation
6/15/2026
Specifications
01 45 00
6/16/2026
Solicitation (RFP)
& Amend 1
6/16/2026
N/A
6/16/2026
01 14 00
Question
Response
Solicitation does not include the Liquidated Damages daily rate as it notes this will be provided via forthcoming Amendment. Rate was not provided with Amendment 1. Please provide Liquidated Damages daily rate.
$12,750.08/day
1.7 QUALITY CONTROL (QC) SPECIALISTS
Provide a separate QC Specialist at the work site for each of the areas as listed in the Matrix listed below, who must assist and report to the QC Manager and who must have no duties other than their assigned quality control duties. These individuals or specialized technical companies are directly employed by the Prime Contractor and cannot be employed by a supplier or subcontractor on this project. Please consider that these QC specialist be employed by subcontractors and not the Prime Contractor.
Phasing; is there a desired phasing for this project that we can portray in our solicitation schedule?
Provide the QC specialists as
required by the matrix and
employed by the Prime
Will the government accept partial BOD on individual buildings or are all four projects required to be turned over at the same time at the end of construction.
No desired phasing specified.
The installation access is heavily geared toward typical DBIDS processes. There is no additional instructions for special MARSOC access and those protocols. Please provide the pass/tag requirements for secondary MARSOC access.
1. Stone Bay Access (Outer
Perimeter): Access to Stone
Bay requires a valid Common
Access Card (CAC) or a Defense
Biometric Identification System
(DBIDS) / Business Access
Identification Badge obtained
in accordance with Section 01
14 00, Paragraph 1.3.1.2.
Paragraph
1.3.1.2
No desired phasing specified.
2. MARSOC Compound Access
(Inner Perimeter): Entry
requires secondary security
processing, where prime
contractors must submit the
6/16/2026
General
6/16/2026
01 14 00
Are there any known PFAS conditions that the contractor needs to consider to comply with to achieve this work?
1.5
Are there any known UXO conditions that the contractor needs to consider to comply with to achieve this work?
names of their employees and
subcontractors using the
attached MARSOC access
roster (excel spreadsheet) to
the NAVFAC Construction
Manager, who then forwards
the information to the
MARSOC Security Office.
Contractors may update the
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Attachment B - PIEE Vendor Access Instructions
- Attachment C - Price Proposal Form
- Attachment D - Construction and Design Experience Project Data Sheet
- Attachment E - Past Performance Questionnaire
- Attachment F - Historical Small Business Utilization
- Attachment G - SPCD
- Attachment H -Small Business Subcontracting Plan
- Solicitation
- Amendment 1
- Attachment C - Price Proposal Form Revised
- Attachment I - DOD-CUI Non-Disclosure Agreement
- P1550 PPI RESPONSES 1