P1550 PPI RESPONSES 5
Updated
A PDF document (138 KB) attached to Design-Bid-Build (DBB) SOF Marine Raider Facilities Complex, Marine Corps Base (MCB) Camp Lejeune, North Carolina, from the Department of the Navy. Due Oct 27, 2026, 2:00 PM (UTC-4).
File name: P1550 PPI RESPONSES 5.pdf
The full file is for paid members, or buy this bid alone.
Preview
PPI
#
Date
Submitted
Reference
Question
Response
General
Construction Notes
A-400 sheets, GENERAL CONSTRUCTION NOTES #4 lists: "PROVIDE
CEMENTITIOUS BOARD AT ALL SHOWER STALLS. PROVIDE GLASS MATT
WATER RESISTIVE BACKING BOARD AS SUBSTRATE TO WALL TILE.
PROVIDE MOISTURE RESISTANT GYPSUM BOARD AT THE FOLLOWING
WALL AND CEILINGS THAT DO NOT RECEIVE TILE: MEN'S TOILET, WOMEN'S TOILET UNISEX TOILET, CO TOILET." This note does not align with the Interior Drawings and other references. Please clearly explain areas that do not require tile inside of restroom and locker spaces to include room tags for walls that do or do not require this board.
T-110 through T-115
(A1)
AV Note (Typ)
Notes on these pages list "ALL A/V CABLING MUST BE IN CONDUIT" Who is responsible for the A/V cabling and conduit? Is this in the A/V package as is typical?
The notes are correct.
Cementitious board is
required at all showers.
Provide tile as indicated on
the Interior Design
Drawings. If walls, portions
of wals, or ceiling are not
scheduled to receive tile
moisture resistant gypsum
board is required.
A/V cabling and conduit by
prime construction
contractor.
6/24/2026
T-110 through T-115
(A1)
Audio/Video
Legend
Please confirm that all items listed in the Audio/Video Legend are CFCI items and are base bid scope.
Confirmed.
6/24/2026
T-505 (A1)
Detail C3
Please clarify the CFCI scope of work from the AACS Enclosure and IDS Enclosure inward. It is understood that the contractor must provide rough-ins per E-505 but clarify GFGI work as it relates to ESS scope of work.
Security cabling and
devices are GFGI.
Infrastructure and power
are CFCI.
6/24/2026
T-505 (A1)
Detail C3
Please clarify the CFCI scope of work to the AACS Enclosure and IDS Enclosure back to source to better clarify GFGI work as it relates to ESS scope of work.
Security cabling and
devices are GFGI.
Infrastructure and power
are CFCI.
6/24/2026
TA001 through TA702
(A1)
All Notes and
Details
Please confirm that all scope listed on the A/V drawings (TA) are not in the base bid contract and therefore part of the A/V package. If this is false, what portion of this set is CFCI as there are no CFCI, GFGI or other indicators provided.
6/24/2026
T-107 through T-109
(A2)
Audio/Video
Legend
Please confirm that all items listed in the Audio/Video Legend are CFCI items and are base bid scope.
Scheduled AV equipment
and labor to is included in
the AV Plan Modification
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Attachment B - PIEE Vendor Access Instructions
- Attachment C - Price Proposal Form
- Attachment D - Construction and Design Experience Project Data Sheet
- Attachment E - Past Performance Questionnaire
- Attachment F - Historical Small Business Utilization
- Attachment G - SPCD
- Attachment H -Small Business Subcontracting Plan
- Solicitation
- Amendment 1
- Attachment C - Price Proposal Form Revised
- Attachment I - DOD-CUI Non-Disclosure Agreement
- P1550 PPI RESPONSES 1