Home / ND NP THRO 204(1) Buck Hill Road / Document

PLANS 100 Percent THRO 204

Updated

A PDF document (20.7 MB) attached to ND NP THRO 204(1) Buck Hill Road, from the Federal Highway Administration. Due Nov 3, 2026, 2:00 PM (UTC-7).

File name: PLANS 100 Percent_THRO 204(1).pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

NPS PMIS No. 192192

NPS Drwg No. 387/80124

SHEET

PROJECT

NUMBER

ND NP THRO 204(1)

A1

BUCK HILL ROAD

U. S.

CANADA

SASKA

T
CHE
WAN

OBA
T

MANI

DEPARTMENT OF THE INTERIOR

NATIONAL

PARK

SERVICE

NATIONAL PARK SERVICE

Minot
Williston

THEODORE ROOSEVELT NATIONAL PARK

Ri
ve
r

Dickinson

Jamestown

A

M INNESOT

M ONTANA

Grand Forks

M
i
ss
ou
ri

PLANS FOR PROPOSED PROJECT

Fargo

ND NP THRO 204(1)

BISMARCK

BUCK HILL ROAD

SOUTH DAKOTA

NORTH DAKOTA KEY MAP

BILLINGS COUNTY

LENGTH 0.72 MILES

PROJECT LOCATION

24 Miles to

10.2 miles

Grassy Butte

to Manning

N

TYPE OF CONSTRUCTION:

ROADWAY RECONSTRUCTION PROJECT

Roadway rehabilitation, parking lot expansion, subexcavation,

100+18 TO 138+15

guardrail replacement, drainage improvements, signing and pavement markings and pullout construction.

ADT (2025)

148 veh/day

ADT (2045)

216 veh/day

DHV

D

0.5

% Trucks

5%

V

12.7 miles

to Sentinel
Butte

20 MPH

e(max)

8.7 miles

6%

to

BUCK HILL OVERLOOK PARKING

U.S. CUSTOMARY DIMENSIONS:

Gladstone

LOT RECONSTRUCTION

Slopes are expressed as RISE:RUN
Dickinson-Theodore
Roosevelt Regional Airport

SPECIFICATIONS:

"STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS

AND BRIDGES ON FEDERAL HIGHWAY PROJECTS, FP-14"

5 mi

10 mi

F TRAN

SP
TO
EN

PLANS PREPARED BY

23.1 miles

15.2 Miles

to Amidon

to New England

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

E
RI
CA

E
D

ON
ATI
RT
O

DEPAR

TM

Scale in Miles

IT
UN

N:\ND\thro204(01)\Roadway\CADD_Sheets\A-Gen_sht\TTL_BuckHill.dgn

[TTL-NPS]

DESIGN DESIGNATIONS:

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

AM
ST

ATES OF

DENVER, CO

APPROVED:

signed by WENDY M LONGLEY
WENDY M LONGLEY Digitally
Date: 2026.07.30 15:09:48 -06'00'

for:

18 June 2026

8:25 AM

R

Chief of Engineering,

DATE

Central Federal Lands Highway Division

Know what'sbelow.

Call
before you dig.

Agency approved by letter

January 7, 2025

www.call811.com

Park Superintendent
Theodore Roosevelt National Park

PROJECT MANAGER

HIGHWAY DESIGN MANAGER

LEAD DESIGNER

R. OLSON

K. KEELE

W. VALENTIN

DATE

NPS PMIS No. 192192

ABBREVIATIONS

A

�

centerline

Δ

curve delta

Ø

diameter

abut.

abutment

ADT

[Symbols Sheet]
N:\ND\thro204(01)\Roadway\CADD_Sheets\A-Gen_sht\SYM_BuckHill.dgn 2:57 PM

5 March 2025

gage (gauge)

S S

ND NP THRO 204(1)

south

BUCK HILL ROAD

galvanized

SADT

seasonal average daily traffic

gdr.

girder

SC

point of spiral to curve

hdwl.

headwall

sec.

section

average daily traffic

HES

homestead entry survey

shldr.

shoulder

aggr.

aggregate

hex.

hexagon

spa.

spacing, spaces or spaced

AH

ahead

horiz.

horizontal

spec.

specification

alt.

alternate

HW

high water

st.

street

appr.

approach

hwy.

The beginning of the document. Download the full file to read on.

Other documents in this bid