Questions and Answers
Question
BOR Response
In reference to drawings 31-417-553,554,555. They read
"Information Only" on the bottom right. Can you confirm these structures are existing?
The informational drawings 31-417-553,554, and
555 are from a previous construction project. They
show the existing GK (Lateral) Intake Structure
that was labeled in the drawings as the "East Canal
Turnout Structure". This is an existing structure.
The structure shown in informational drawings 31417-553,554, and 555 is the existing GK (Lateral) Intake Structure and is directly adjacent to the GK
Check structure. These informational drawings are
provided to show dimensions and other relevant
information on the existing structure to assist
offerors in their approach to constructing the new
GK Check Structure.
Note 4 on drawing 31-417-1052, refers to drawings
31-417-1071, 31-417-1081, and 31-417-1082.
These drawings show the GK Check structure.
Constructing the GK Check Structure is a
requirement of this solicitation. The same note also
refers to informational drawings 31-417-553,554,
and 555. These drawings show the existing GK
Inlet Structure, which is directly adjacent to the GK
Check Structure. Constructing the GK Inlet
Structure is NOT a requirement of this solicitation.
The Bureau of Reclamation will provide a KMZ
file of all the major project components with the
disclaimer that all structure locations, ROW
extents, and area boundaries are approximate and
are strictly for use in aiding the contractors project
comprehension. Contractors must request the KMZ
file from the Contracting Officer.
It is not anticipated that any taxes will be
applicable to this contract. It is the responsibility of the contractor to determine if any federal, state, or
local taxes are applicable. If any of those taxes are
applicable, the contractor will be reimbursed based
on the taxes paid throughout the life of the
contract. The language in the solicitation has been
updated to state that the total price includes all
applicable Federal, State, and local taxes.
The 30-page limit does not include cover pages,
table of contents, indexes, enclosures, executive
summaries, construction schedules, tabs,
glossaries, resumes, experience forms, key
personnel forms, drawings, diagrams, PPQs, SF1442s, Section K reps and certs, Schedule B
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Bid document
- Attachment 1: Specifications
- Attachment 2: Drawings
- Attachment 3: Wage Determination Heavy - Montrose County CO
- Attachment 4: Wage Determination Building - Montrose County CO
- Attachment 6: Past Performance Questionnaire
- Attachment 7: Experience Form
- Attachment 8: Key Personnel Form
- Sol
- Site Visit Agenda 0001
- Sol Amendment 0001
- Updated Drawings 0002