Home / Acoustic Testing for the IM-272A/WDQ Air Particle Detector… / Document

Reference e Isolation Valve Packing Instructions

Updated

A PDF document (147 KB) attached to Acoustic Testing for the IM-272A/WDQ Air Particle Detector and isolation valves, from the Department of the Navy. Due Oct 31, 2026, 11:00 AM (UTC-4).

File name: Reference e Isolation Valve Packing Instructions.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

139_1 (08/2019)

Bechtel Plant Machinery, Inc.
3500 Technology Drive
Monroeville, PA 15146-2459

Post Office Box 1021
Schenectady, NY 12301-1021

BPMI-VAE-SOW-0347

Revision: One
Dated: 6/11/2020

SCOPE OF WORK

For Retesting/Return of APD Valves and Controllers

Prepared by:
David M. Hecht
Flow Control Valves
Flow Control Equipment Department

Approved by:
Douglas F. Schamber, Manager, DC
Flow Control Valves
Flow Control Equipment Department

BPMI-VAE-SOW-0347

Revision: One
Dated:
6/11/2020
Record of Revisions Page

Revision

Date

Page(s)

Description of
Change

Original

6/26/13

R. S. Belan

D. C. Hahn

One

6/11/20

D. M. Hecht

D. F. Schamber for

D. N. Maydak

i

Transmittal Letter

BPMI-VAE-FCV-00925

Dated June 27, 2013
N/A

NAVSEA Approval
Letter
N/A
N/A

BPMI-VAE-SOW-0347

Revision: One
Dated:
6/11/2020

1.0

SCOPE

This scope of work requires the testing and return of two ½-inch Air Particle Detector (APD) valves and one APD controller provided as Government Furnished Equipment (GFE) for vendor use.

2.0

LIST OF APPLICABLE DOCUMENTS

2.1

SPECIFICATIONS

2.1.1
2.1.2

MIL-E-917

MIL-E-16400

2.1.3 MIL-PRF-23199, Rev F

2.1.4

2.2

DRAWINGS

2.2.1
2.2.2

3.0

MIL-PRF-23199/1, Rev C

-Electrical Power Equipment, Basic Requirements
-Electronic, Interior Communication and Navigation
Equipment, Naval Ship and Shore, General
Specification
- Performance Specification; Packaging and
Packing Requirements for Special Purpose
Mechanical Components and Repair Parts
- Packaging, Packing, and Marking (PP&M)
Requirements for Instrumentation and Control
Equipment

820-5787496, Rev K
820-5787550, Rev D

- APD Valve Assembly Drawing
- APD Isolation Valve Controller Assembly

REQUIREMENTS

Two ½-inch APD valves and one APD controller, as noted above, will be provided as GFE for use in vendor testing program. Upon receipt of the equipment, Section 3.1 should be completed. After the vendor has completed their testing program, Sections 3.2 through 3.4 shall be performed to verify component operability.
3.1

Receipt Inspection. The following should be completed upon receipt of the equipment. Any deviations should be reported to the buyer. Packaging materials can be saved for possible reuse when shipping back equipment. Any paperwork included in the original packaging shall be saved to be repacked with the equipment in Section 4.0. 3.1.1

Nameplate. Verify conformance between nameplate identification data for the component received and any identification or certification papers received with

The beginning of the document. Download the full file to read on.

Other documents in this bid