1240BH27Q0001
GAOA Star Meadows MEP Repair & Utility
Flathead National Forest
All RFI answers are for clarification purposes only.
RFI #1 - What info is available for the Well. Static water level, how deep is the drop pipe on hand pump.
125 ft deep w/ steel casing to 70' & PVC to 125' (6" dia) please check the Well Log on sheet 14 of drawings. Also, probably 3 joints (3=60') of 2" pvc drop pipe on handpump, thought static water varied by season.
RFI #2 - Does contractor supply the propane tank?
No. The government will supply the 500-gallon propane tank, but contractors will move and connect it.
RFI #3 - Explain the primary heat being radiant floor but its an Option Item?
Yes, bids are evaluated as a "TOTAL COST" i.e base items + option items. The design of boiler heating system includes radiant floor loops, temp swings & pump flow rates for methods including forced-air & in-floor heat to be sized for the thin walls. The government will decide if the radiant floor heat option is exercised.
RFI #4 - Is the building open all year.
Yes, mechanical design is needed for use during winter. RFI #5 - Does work on the kitchen sink require plumbing for water.
Yes.
RFI #6 - Is a new drain included.
Yes, it should meet building code requirements.
RFI #7 - What is required for the sewer.
Capped sewer piping for clean-outs, a toilet, a vanity, & a shower installed below the concrete slab.
RFI #8 - Can we remove whole slab.
Yes, saw-cutting of the concrete is needed w/ bedding & patching are required.
RFI #9 - Does the whole wall come out.
Yes
RFI #10 - Is it a bearing wall.
No.
RFI #11: How does that affect the mechanical room.
New walls are required.
RFI #12 - What finish is needed.
3/4-inch plywood backing to mount equipment (+drywall) on mechanical side & unfinished stud bays as allowed by fire code in the bathroom.
RFI #13 - Landscaping & fence? Appears the waterline path will wipe out trees?
It’s understood that work to dig trenches will have an impact. The path of the waterline to the cabin shall be routed south through fence & west down the road before returning north through the fence to the cabin in an effort to avoid some trees and shrubs.
RFI #14 -The same project was solicited before under solicitation 1240LU26Q0011 (due February 2026) and 1240BH26Q0050 (due September 2, 2026). Why were those solicitations not awarded? Has the scope, the drawings or the budget changed since then?
Previous solicitations found the quotes for this requirement non-responsive. The documents provided with solicitation 1240BH27Q0001 reflect the current scope of the requirement.