SfTE INSPECTION TOUR/PREBID CONFERENCE RECORD
1240BH27QOOO1
STAR MEADOWS PROJECT SITE
2. Date & Time:
3. Title:
PATRICK SIERS, COR
OCT. 27, 11 am
GAOA Star Meadows MEP, Repairs, & Utility
6. A/fended By: (Altach Separate sheet when necessary)
Name and Firm
Phone No.
(Include Area Code)
Address (w/ zip code)
Trinity Construction Services
(Robert) Ogden, UT
702.406.1295
Ryan’s Heating & Air Inc
(Ryan) Kalispell
406.755.1444
Bald Rock Plumbing Inc.
(Gordy) Kalispell, MT
406.270.1762
West Fork Construction
(Chris) Kalispell, MT
406.261.1689
Tamarack Frontier LLC
(Anthony) Kalispell, MT
406.955.6782
8. Questions asked & responses given: (Use Reverse when necessary) Continued On Page 2 Q1: What info is available for the Well. Static water level, how deep is the drop pipe on hand pump. Ans: 125 ft deep w/ steel casing to 70' & PVC to 125' (6" dia) please check the Well Log on sheet 14 of drawings. Also probably 3 joints (3=60') of 2" pvc drop pipe on handpump, thought static water varied by season. Q2: Does contractor supply the propane tank? Ans: No. The government will supply the 500 gallon propane tank but contractor will move and connect it. Q3: Explain the primary heat being radiant floor but its an Option Item? Ans: Yes, bids are evaluated as a "TOTAL COST" i.e base items + option items. The design of boiler heating system includes radiant floor loops, temp swings & pump flow rates for methods forced-air & in-floor heat & sized for thin walls. The gov will decide if the radiant floor heat option is exercised. Q4: Is the bldg open all year. Ans: Yes, mechanical design is needed for use during winter. 9. Was a complete site inspection tour made?
By (Name)
Patrick K Siers
□ Yes D No (If "No" explain)
Title
COR
Date
Oct. 27th, 2026
SfTE INSPECTION TOUR/PREBID CONFERENCE RECORD
1240BH27QOOO1
STAR MEADOWS PROJECT SITE
2. Date & Time:
3. Title:
PATRICK SIERS, COR
OCT. 27, 11 am
GAOA Star Meadows MEP, Repairs, & Utility
6. A/fended By: (Altach Separate sheet when necessary)
Name and Firm
Phone No.
(Include Area Code)
Address (w/ zip code)
Trinity Construction
Construction Services
(Robert) Ogden, UT
702.406.1295
Ryan’s Heating & Air Inc
(Ryan) Kalispell
406.755.1444
Bald Rock Plumbing Inc.
(Gordy) Kalispell, MT
406.270.1762
West Fork Construction
(Chris) Kalispell, MT
406.261.1689
Tamarack Frontier LLC
(Anthony) Kalispell, MT
406.955.6782
8. Questions asked & responses given: (Use Reverse when necessary)
Continued from page 1
Q5: Does work on the kitchen sink require plumbing for water. Ans: Yes.