Revision 0003 A2
Updated
A PDF document (320 KB) attached to Design-Bid-Build (DBB) SOF Marine Raider Facilities Complex, Marine Corps Base (MCB) Camp Lejeune, North Carolina, from the Department of the Navy. Due Oct 27, 2026, 2:00 PM (UTC-4).
File name: 1701820dwg_Revision_0003_A2.pdf
The full file is for paid members, or buy this bid alone.
Preview
DIMENSION CLARIFICATION
SYM
DESCRIPTION
06/19/26
DATE
APPR
F.F.
PER SCHED.
SEE PLAN
DOWEL TO MATCH WALL REINF.
W/ STD. HOOK ALT. END
CMU WALL PER PLAN
F.F.
SEE PLAN
THICKENED SLAB EDGE BEYOND
SPREAD FTG. BEYOND
PER PLAN
CONTINUE TIE BEAM
REIN. PER SCHED. THRU THICKENED SLAB
C
C4
SCALE: 3/4" = 1'-0"
B.P. & A.B.'S PER PEMB DWGS
A/E INFO
LAP PER SCHED.
APPROVED
DOWEL TO MATCH WALL REINF.
W/ STD. HOOK ALT. END
FOR COMMANDER NAVFAC
CMU WALL PER PLAN
ACTIVITY
F.F.
SATISFACTORY TO
DES
DETAIL
SHEATHING PER ARCH
DETAIL
B4
SCALE: 3/4" = 1'-0"
CWJ
JWJ
FIRE PROTECTION
HPN
SCALE: 3/4" = 1'-0"
BRICK VENEER PER ARCH
CL OF WALL &
THICKENED SLAB FTG.
PER PLAN
DEPARTMENT OF THE NAVY
A
CMU WALL BEYOND
SLAB PER PLAN
F.F.
SEE PLAN
1' - 6"
TAPERED COLUMN
PER PEMB
DRAWINGS
EXTERIOR STUD
WALL
0' - 0 3/4"
MIN
COLUMN FURRING
PER ARCH
(3) #5 T&B
B
P-1550 SOF MARINE RAIDER
COMPANY / TEAM FACILITIES
HAIRPIN BELOW
SCALE:
PER PLAN
A
AS INDICATED
1701820
EPROJECT NO.:
File Path:
Print Date:
A2
DETAIL
DETAIL
A4
SCALE: 3/4" = 1'-0"
CONSTR. CONTR. NO.
NAVFAC DRAWING NO.
SCALE: 3/4" = 1'-0"
A2
CO BLDG
LGG
SGL/MDM
CAMP LEJEUNE, NC
B2
PER PLAN
CHK
CHIEF ENG/ARCH
NAVAL FACILITIES ENGINEERING COMMAND
(3) #5 T&B
FOOTING PER PLAN
HON
BRANCH MANAGER
MARINE CORPS BASE
B
DRW
LGG
PM/DM
DETAILS
SEE PLAN
NAVAL STATION - NORFOLK, VA
0' - 1 1/2"0' - 5"0' - 1 1/2"
SLAB PER PLAN
1' - 6"
0' - 4"
PER PLAN
0' - 4"
1' - 0"
0' - 11 1/2"
0' - 5"
CL OF WALL &
THICKENED SLAB FTG.
0' - 5"
0' - 1 1/2" 0' - 5" 0' - 1 1/2"
SEAL
IPT MARINE
SCALE: 3/4" = 1'-0"
1' - 5"
DETAIL
NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND ~ MIDATLANTIC
DETAIL
SLAB EDGE
C:\Users\henry.KAYDOS-DANIELS\Documents\P1550 Structure 2023_A2_honewell.rvt 6/19/2026 2:16:58 PM
08 MAY 2026
PER SCHED.
C2
D
C
REIN. T&B PER SCHED.
SLAB PER PLAN
SLAB PER PLAN
PER SCHED.
PER PLAN
TIES PER SCHED.
LAP PER SCHED.
PER PLAN
D
FINAL SUBMITTAL
12903473
SHEET
of 283
S-512
DRAWFORM REVISION: 25 AUGUST 2020
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Attachment B - PIEE Vendor Access Instructions
- Attachment C - Price Proposal Form
- Attachment D - Construction and Design Experience Project Data Sheet
- Attachment E - Past Performance Questionnaire
- Attachment F - Historical Small Business Utilization
- Attachment G - SPCD
- Attachment H -Small Business Subcontracting Plan
- Solicitation
- Amendment 1
- Attachment C - Price Proposal Form Revised
- Attachment I - DOD-CUI Non-Disclosure Agreement
- P1550 PPI RESPONSES 1