Home / Design-Bid-Build (DBB) SOF Marine Raider Facilities… / Document

Revision 0004 A2

Updated

A PDF document (4.3 MB) attached to Design-Bid-Build (DBB) SOF Marine Raider Facilities Complex, Marine Corps Base (MCB) Camp Lejeune, North Carolina, from the Department of the Navy. Due Oct 27, 2026, 2:00 PM (UTC-4).

File name: 1701820dwg_Revision_0004_A2.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

APPR

A-313

1. REFERENCE SHEET A-001 FOR SYMBOL LEGEND

2. REFERENCE SHEET A-501 FOR WALL TYPES

3. REFERENCE SHEET A-601 FOR DOOR AND FRAME SCHEDULE

4. REFERENCE SHEET A-605 FOR WINDOW SCHEDULE

5. REFERENCE INTERIOR DESIGN DRAWINGS FOR FINISH SCHEDULE

6. REFERENCE INTERIORS DRAWINGS FOR CASEWORK DIMENSIONS AND DETAILS

7. REFERENCE THE LIFE SAFETY DRAWINGS FOR LOCATIONS OF RATED WALLS

AND SMOKE PARTITIONS

8. DIMENSIONS ARE TAKEN FROM FACE OF METAL STUD AND FACE OF CMU

9. DIMENSIONS TO OPENINGS ARE SHOWN TO CENTER OF OPENING AT METAL

STUDS AND EXTERIOR OF OPENINGS AT CMU WALLS

10. PROVIDE BACKING AS REQUIRED TO SUPPORT AND MOUNT VARIOUS ALL

ATTACHED FIXTURES PER MANUFACTURER'S RECOMMENDATIONS

11. PROVIDE STEEL STUD BACKING FOR ALL TV BRACKETS AS SHOWN ON AUDIO

VISUAL DRAWINGS

12. FOR ELECTRICAL BOXES AT STC WALLS, OFFSET ON STUD SPACE AND SEAL

OPENINGS THROUGH PARTITIONS

13. PROVIDE FULL HEIGHT STAINLESS STEEL CORNER GUARDS AT EXPOSED

CORNERS OF GYPSUM PARTITIONS

14. PROVIDE FIRE RATED PLYWOOD BACKBOARD AT COMM ROOMS

15. FOR LOUVERS, WINDOWS AND STOREFRONT TYPES SEE SHEET A-60X

16. PROVIDE HEAVY DUTY IMPACT RESISTANT GYPSUM BOARD AT THE FOLLOWING

ROOMS TO 12'-0" MINIMUM: TEAM STAGING/STORAGE, COMPANY STORAGE,

INDIVIDUAL ISSUE CAGE STORAGE, LAUNDRY, ELECTRICAL CLOSET, ENTRY

VESTIBULE, LOBBY, AND CORRIDOR

A

149A

A1

147B

F

G1

TEAM

STAGING/STORAGE

CONSTRUCTION KEYNOTES

G1

COMPANY

STORAGE

C

G1

147C

150C

148C

151B

C.3

149C

J. E

E NRED ARUR

STORAGE CAGES (FF&E)

8" DIAMETER 4'-0" HIGH STEEL PIPE CONCRETE FILLED BOLLARD

CONCRETE SLAB. LIGHT BROOM FINISH

GEAR WASH SINK

COLUMN

3-3/4" x 5-1/4" DOWNSPOUT

WIRE MESH PARTITIONS

CH

E

8640

III

E , I T E CT

TEAM

STAGING/STORAGE

147A

T

R

TEAM

STAGING/STORAGE

E W H CA RO L N

B E RN

N

TEAM

STAGING/STORAGE

A1

G1

G1

G1

148B

A1

08 MAY 2026

C

SEAL

C.4

A/E INFO

INDIVIDUAL

CAGE STORAGE

APPROVED

James E. Donahue, R.A.

FOR COMMANDER NAVFAC

ACTIVITY

C3

A-203

SATISFACTORY TO

REL

DES

DRW

PM/DM

A3

A3

A3

A3

144B

ELECTRICAL

144A

A1

144C

A3

D
C3
A-303

A2 / A-103

A3

A5
A-508

153A

A3

A3

CORRIDOR

A3

A5
A-508

C3
A-303

AREA A

AREA C

AREA E

AREA B

AREA D

AREA F

DJD

CHIEF ENG/ARCH

JWJ

FIRE PROTECTION

HPN

D.3

TEAM CHIEF

TEAM LEADER

TEAM LEADER

TEAM CHIEF

TEAM CHIEF

TEAM LEADER

TEAM LEADER

TEAM CHIEF

COMM

DEPARTMENT OF THE NAVY

D3
A-301

A
A2

FLOOR PLAN - AREA A

SCALE: 1/8" = 1'-0"

KEY PLAN

N

SCALE 1" = 60'

4'

8'

16'

60'

REGISTERE

D

60'

120'

CERT. NO.
50679
N

N E ORTH CAROLINA .

W B N N

ER

File
Print

C.

8'

GRAPHIC SCALE: 1"=60'

AR

A

1701820

EPROJECT NO.:

CONSTR. CONTR. NO.

R
CO

GRAPHIC SCALE: 1/8"=1'-0"

MBF

N

B

AS INDICATED

SCALE:

CHITECT

AR CHITECTURAL S

The beginning of the document. Download the full file to read on.

Other documents in this bid