Revision 01
Updated
A PDF document (1.1 MB) attached to Cooling Tower, Roofing, and Structural Construction, from the Bureau of Engraving and Printing. Due Dec 11, 2026, 12:00 PM (UTC-6).
File name: 2031ZA26R00027 Revision 01 11052026.pdf
The full file is for paid members, or buy this bid alone.
Preview
1. SOLICITATION NUMBER
2. TYPE OF SOLICITATION
□
□
SOLICITATION, OFFER,
2031ZA26R00027
AND AWARD
(Construction, Alteration, or Repair)
SEALED BID (IFB)
CODE 2031ZA
8. ADDRESS OFFER TO
BEP-ACQUISITION
Bureau of Engraving and Printing, Office of
Acquisition, 301 14th Street SW
Washington, DC, 20228-0001, US
9. FOR INFORMATION
CALL:
I a. NAME
►I Williams, LaQulla Lashun
OF
PAGE
NEGOTIATED (RFP)
IMPORTANT - The "offer'' section on the reverse must be fully completed by offeror.
4. CONTRACT NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
7. ISSUED BY
3. DATE ISSUED
PAGES
6. PROJECT NUMBER
b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
l
202.486.2465
SOLICITATION
NOTE: In sealed bid solicitations "offer'' and "offeror'' mean "bid and "bidder''.
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Tttle, identifying number, date)
Design-Build Cooling Tower, Roofing, and Structural Construction at DCF Bureau of Engraving and Printing. Attachment 1 - Past Performance Questionnaire
Attachment 2 - Davis-Bacon Wage Determination
Attachment 3 - Statement ot Work(SOW) - Cooling Towers
Attachment 4 - Pricing Table
Attachment 5 - Quality Assurance Surveillance Plan
Attachment 6 - Initial Staffing Plan
Attachment 7 - Monthly Worktorce Report
Include attachments 8, 10,11,12 and 14-32.
Total small business set-aside under NAICS 236220, $45.0M size standard. The magnitude of construction is Between $1,000,000 and $5,000,000. Offerers must be dassified as small business as of the date the offer is submitted and on the date of award. A pre-proposal site visit has been scheduled for 09/30/2026 at 9:00 AM. Must RSVP via email to the Contracting Officer at least 5 days prior to the site visil For further information regarding the site visit refer to Section L.4 52.236-27 Site Visit (Construction) (FEB 1995).of this solicitation.
All questions regarding this solicitation must be emailed directly to the CONTRACTING OFFICER Laqulla Williams at [email protected] ONLY by the required deadline outlined in section L.6 of this solicitation.
11. The contractor shall begin performance within
D award,
� notice to proceed. This performance period is
[81 mandatory
D negotiable. (See
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
□
(If "YES", indicate within how many calendar days after award in Item 12b.)
0YES
No
).
12b. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Bid document
- Attachment 1: Past Performance Questionnaire
- Attachment 3: Statement of Work - Cooling Towers
- Attachment 4: Pricing Table
- Attachment 5: Quality Assurance Surveillance Plan
- Attachment 7: Monthly Workforce Report
- Bid document
- Attachment 3: Statement of Work - Cooling Towers Revision 02 Amendment 2
- Attachment 4: Pricing Table Revision 01 Amendment 2