SA 0002 Q A 3 0002
Updated
A PDF document (159 KB) attached to Scaffolding for Repair and Repoint Chalmette Monum, from the Departmental Offices. Due Nov 13, 2026, 2:00 PM (UTC-5).
File name: B09_SA_0002_Q_A__3_0002.pdf
The full file is for paid members, or buy this bid alone.
Preview
RFQ 140D0427Q0915
Attachment 3, Questions Form
QUESTIONS FORM
#
RFQ
Section
Question
SF-1442
Blocks
12a/12b;
RFQ
Volume
II,
Section 3
(Evidence
of Ability
to Obtain
Bonding)
Attachme
nt 1,
Statemen
t of Work
§4c
Response
Change
to RFQ?
Description of Change
Technical/
Contractual
SF-1442 Block 12a is checked
No
YES for performance and
Follow RFO FAR 52.228-15
payment bonds. If the
for bonding requirements.
awarded price is at or under
$150,000, are 100%
Evidence showing the
performance and payment
quoter’s ability to be
bonds still required within 7
bonded is required in
calendar days of award, or
accordance with Volume II
does the Government intend
Section 3.
to waive/reduce bonding at
Any applicable
that dollar level? Separately,
Performance and
will a surety commitment
Payment bonds will be
letter issued under the SBA
required after award and
Surety Bond Guarantee
before Notice to Proceed
(QuickApp) program satisfy
is issued.
the Volume II Section 3
evidence requirement?
N/A
Contractual
What specific Louisiana
license, if any, must an outof-state specialty scaffold contractor hold to perform
scaffold
N/A
Technical
The Contractor shall
No
comply with all applicable
federal, state, and local
licensing, registration,
permitting, and regulatory
RFQ 140D0427Q0915
Attachment 3, Questions Form
(Contract
or
Responsi
bilities —
licenses/
permits)
design/erection/dismantling
only (no masonry or general
construction) under this
contract — is a Louisiana
Commercial Contractor
license required, and if so in
what classification? Must
any required license be held
at time of quote, or is it
sufficient to obtain it before
award / notice to proceed?
requirements governing
the performance of
scaffolding services.
Where applicable, the
Contractor shall maintain
all licenses and
qualifications required by
the jurisdiction in which
the work is performed.
The Contractor shall
demonstrate adequate
bonding capability and
maintain required
insurance coverage in
accordance with the
contract requirements.
All scaffolding work,
including erection,
modification, inspection,
maintenance, and
dismantling, shall comply
with applicable OSHA
regulations and projectspecific safety
requirements.
RFQ 140D0427Q0915
Attachment 3, Questions Form
The beginning of the document. Download the full file to read on.