Home / Homeland Security Cutter - Light Icebreaker (HSC-L)… / Document

Section J-02 Design and Readiness Review Requirements and Criteria

Updated

A PDF document (293 KB) attached to Homeland Security Cutter - Light Icebreaker (HSC-L) Solicitation, from the US Coast Guard. Due Nov 16, 2026, 2:00 PM (UTC-5).

File name: Section J-02 Design and Readiness Review Requirements and Criteria_A00007.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

USCG HOMELAND SECURITY

CUTTER – LIGHT ICEBREAKER

(HSC-L)

DESIGN AND READINESS REVIEW

REQUIREMENTS AND CRITERIA

ATTACHMENT J-2

Version: [A00007]

Prepared by:

COMMANDANT (CG-SEA-A8)

UNITED STATES COAST GUARD STOP 7800

2703 MARTIN LUTHER KING JR AVE SE

WASHINGTON DC 20593-7800

Distribution Statement A: Approved for public release; distribution is unlimited.

Homeland Security Cutter – Light Icebreaker (HSC-L)
Readiness Review Requirements and Criteria

70Z02326R93280004

ORIG

Scope: This attachment defines the entrance, demonstration and exit criteria for the major Technical Reviews for the HSC-L program.

A. Preliminary Design Review (PDR)

A.1 The Contractor shall demonstrate successful completion of the following Entrance Criteria:
A.1.1 Present any proposed changes to the contract design that are technically feasible and consistent with a product that can meet the HSC-L System Specifications.
A.1.2 The revised contract design is balanced with internally consistent and convergent design characteristics of the Principal Dimensions, Arrangements, Area / Volume, Structures, Weight, Stability, Propulsion Power and Electric Power from a common design baseline with minimal risk of subsequent adverse changes.
A.1.3 The revised contract design incorporates vendor furnished information (VFI) for equipment identified for mission critical functional areas. A.1.4 [A00001] Contract deliverables per Table 1 have been submitted to the Government per Attachment J-4 CDRL timeframe.
A.1.5 Engineering descriptions of the ship system and subsystems and associated architecture are complete, as demonstrated by Government concurrence of the design changes to the following subjects: A.1.5.1 General arrangement
A.1.5.2 Hull and deckhouse structure and scantlings
A.1.5.3 Propulsion system and bow thruster, including resistance, powering, and maneuvering (i.e., station keeping for ATON)
A.1.5.4 Control surfaces, rudder sizing, and turning performance A.1.5.5 Weight estimate, intact stability, damage stability, and towing stability A.1.5.6 Details of the production design for the electrical power generation, storage, and distribution system
A.1.5.7 Interior lighting system
A.1.5.8 Exterior lighting system
A.1.5.9 Pilothouse arrangement and seating
A.1.5.10 Machinery space(s) arrangement
A.1.5.11 Details of the heating, ventilation, and air conditioning systems A.1.5.12 Mast and antenna configuration
A.1.5.13 Fire detection and suppression system