SPECIFICATIONS REPLACE OR CHILLERS
Updated
A PDF document (12.2 MB) attached to Con | Z1DA | Replace or Chillers | 580-23-105 | Solicitation, from the Department of Veterans Affairs. Due Dec 2, 2026, 2:00 PM (UTC-6).
File name: 580-23-105 SPECIFICATIONS REPLACE OR CHILLERS.pdf
The full file is for paid members, or buy this bid alone.
Preview
26 FEBRUARY 2026
REPLACE OR
CHILLERS
PROJECT #: 580-23-105
MICHAEL E. DEBAKEY VA MEDICAL CENTER
HOUSTON, TEXAS
SPECIFICATIONS
100% SUBMITTAL
CONSTRUCTION DOCUMENT
REPLACE OR CHILLERS
MICHAEL E. DEBAKEY VAMC – HOUSTON, TX
PROJECT #: 580-23-105
SECTION 00 01 07
SEALS PAGE
CERTIFICATION
The technical material and data contained in these Contract Documents were prepared under the supervision and direction of the undersigned, whose seal, as a licensed professional to practice as such, is affixed below.
James M. King, P.E.
Division 0-1, 7, 9
Arlo Hilick, P.E.
Division 3, 5, 13
SEALS PAGE
00 01 07-1
REPLACE OR CHILLERS
MICHAEL E. DEBAKEY VAMC – HOUSTON, TX
PROJECT #: 580-23-105
Joshua Wood, P.E.
Division 23
Approved by Ryan Litzko, P.E.
Division 26
SEALS PAGE
00 01 07-2
REPLACE OR CHILLERS
MICHAEL E. DEBAKEY VAMC – HOUSTON, TX
PROJECT #: 580-23-105
PUB. DATE: 02-01-26
DEPARTMENT OF VETERANS AFFAIRS
VHA MASTER SPECIFICATIONS
Section 00 01 10
SECTION NO
DIVISION AND SECTION TITLES
DATE
DIVISION 00 - SPECIAL SECTIONS
00 01 07
00 01 15
Seals Page
List of Drawing Sheets
05-20
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00
01 32 16.15
01 33 23
01 35 26
01 42 19
01 45 00
01 45 29
01 45 35
01 74 19
01 81 13
01 91 00
General Requirements
Project Schedules (Small Projects – Design/Bid/Build)
Shop Drawings, Product Data, and Samples
Safety Requirements for Major Projects
Reference Standards
Quality Control
Testing Laboratory Services
Special Inspections
Construction Waste Management
Sustainable Construction Requirements
General Commissioning Requirements
11-21
01-24
10-24
05-24
11-20
02-21
11-18
06-21
04-22
10-17
04-22
DIVISION 03 – CONCRETE
03 30 53
(Short-Form) Cast-in-Place Concrete
01-21
DIVISION 05 – METALS
05 12 00
05 31 00
05 50 00
05 51 00
Structural Steel Framing
Steel Decking
Metal Fabrication
Metal Stairs and Railings
11-18
01-21
08-18
01-21
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
07 84 00
07 92 00
Firestopping
Joint Sealants
01-21
04-22
DIVISION 09 – FINISHES
00 01 10 - 01
REPLACE OR CHILLERS
MICHAEL E. DEBAKEY VAMC – HOUSTON, TX
SECTION NO
09 91 00
PROJECT #: 580-23-105
PUB. DATE: 02-01-26
DIVISION AND SECTION TITLES
DATE
Painting
01-21
DIVISION 13 - SPECIAL CONSTRUCTION
13 05 41
Seismic Restraint Requirements for Non-Structural Components
01-21
DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 05 11
23 05 12
23 05 41
23 07 11
23 08 00
23 09 23
23 21 13
23 21 23
23 64 00
Common Work Results for HVAC
General Motor Requirements for HVAC and Steam Generation Equipment
The beginning of the document. Download the full file to read on.