25-0063 REPLACE WATER SOURCE HEAT PUMP, BLDG SH50
CONTRACT N40085-25-B-0063
NAVFAC SPECIFICATION
NO. 25-0063
REPLACE WATER SOURCE HEAT PUMP, BLDG SH50
AT THE
MARINE CORPS BASE, CAMP LEJEUNE, NORTH CAROLINA
DESIGN BY:
Ryan Duncan, P.E.
Design Branch, Mechanical Section
SPECIFICATION PREPARED BY:
Kim R. Sample
Date: October 7, 2026
SPECIFICATION APPROVED BY:
Digitally signed by
MAAS.CHRISTOPHER.JETT.1588040727
DN:
MAAS.CHRISTOPHER.JETT.1588040727 CN=MAAS.CHRISTOPHER.JETT.1588040727, OU=USMC, OU=PKI, OU=DoD, O=U.S.
Government, C=US
Date: 2026.10.26 11:58:09-04'00'
Christopher J. Maas, P.E.
Director Design Branch, Public Works Division
Jonathan D. McGuire, Commander, CEC, U.S. Navy for
Commander, Naval Facilities Engineering
25-0063
10-6-2026
Building SH50 Scope of Work
Facility SH50 Water Source Heat Pump Replacement Project 25-0063
•
Project Name: SH50 Replace Water Source Heat Pump Project (25-0063)
•
Location: Facility SH50
•
Objective: A turnkey modernization of the facility's mechanical, hydronic, and energy-management systems. This includes replacing legacy heat pumps and controls with new, high-efficiency equipment and integrating them into an upgraded Building Automation System (BAS).
Key Execution Constraints
•
Facility Occupancy: The facility will remain occupied throughout the project. •
Equipment changeovers to occur between April 1, 2026 through April 1, 2027.
•
Equipment On-Site: On-site demolition cannot begin until all major replacement equipment has been delivered and verified on-site.
•
Utility Outages: A written request for any utility shutdown must be submitted and approved at least 14 days in advance.
•
Contractor to install government provided portable heat pumps (dual-mode environmental controls units) to provide temporary heating and cooling for the space during renovation for Conference Room, Room 102, 104, 107 & 111. Route portable heat pump exhaust air through ceiling tile and exhaust in attic space.
Scope of Work Highlights
1. Demolition:
•
Complete removal and certified off-site disposal of nine (9) water-to-air heat pumps (WAHP), one (1) water-to-water heat pump (WWHP), one (1) air handling unit (AHU), Pump 1 & 2, and all associated legacy DDC controls, sensors, and wiring.
2. Preservation:
•
Existing distribution piping, ductwork, and structural hangers are to be protected and reused.
•
The existing electric pipe heat trace system must be carefully preserved and protected during work.
•
Existing DDC control panels may be reused if they are in good condition.