Statement of Work Amendment 3
Updated
A PDF document (12.7 MB) attached to Replace DSN-HDD Generator for 78th Signal Battalion, Camp Zama, Japan., from the Department of the Air Force. Due Nov 24, 2026, 11:00 AM (UTC+9).
File name: SOW Amend 0003.pdf
The full file is for paid members, or buy this bid alone.
Preview
FI-MUE Replace Zama DSN-HHD Generator – Updated SOW
STATEMENT OF WORK (SOW)
FI-MUE Replace Zama DSN-HHD Generator
78th Signal Battalion
Camp Zama, Japan
---
Updated: 10 November 2026
(Incorporates responses to Contractor Questions / Clarifications)
1. INTRODUCTION
This Statement of Work (SOW) defines the requirements, scope, responsibilities, and deliverables for the replacement and disposal of the 150 kVA emergency power diesel generator located on Camp Zama, Japan, Building 121.
This updated SOW incorporates clarifications provided in response to Contractor (KTR) questions. Where a conflict exists between this document and prior drafts, this updated version governs. The more stringent of applicable U.S. or Japanese requirements shall apply.
2. SCOPE OF WORK
The contractor shall provide all necessary materials, equipment, labor, and services to:
2.1. Decommissioning and Removal of Existing Generator
• Disconnection from the electrical distribution system. • Safe removal of residual fuel and proper disposal in accordance with environmental regulations. • Safe removal of coolant and oil and proper disposal in accordance with environmental regulations.
• Disassembly and transport of the existing generator from the site (Bldg. 121, Camp Zama) to an authorized disposal facility. "Authorized waste disposal facilities" means facilities licensed under Japanese laws and regulations.
• Removal and disposal of old conduits and exhaust piping that cannot be re-used for the new generator system.
• The existing stainless-steel diesel fuel tank (renewed 2008 and confirmed serviceable), associated fuel piping, and electrical wiring shall be retained if they remain in a serviceable condition after contractor inspection, testing, and certification. Section 4.1 intent is to remove the generator unit itself while retaining serviceable tank, piping, and wiring.
2.1.1. Asbestos Abatement and Removal in Building 121, Room 112 The contractor shall utilize the bulk asbestos sample summary and laboratory analytical results for the following materials located in Building 121, Room 112. These have been identified as AsbestosContaining Material (ACM) and require abatement and removal. • Silver wrapped pipe insulation: Samples 162-01A and 162-02A from Room 112 contained 95% Chrysotile asbestos.
• Silver wrapped duct insulation: Sample 162-03A from Room 112 contained 50% Chrysotile asbestos.
78th Signal Battalion – Camp Zama, Japan | Page 1 of 14
FI-MUE Replace Zama DSN-HHD Generator – Updated SOW